Puerto Rico’s key electrical system privatization initiative has been a longshot to save money for the people of Puerto Rico—and the odds are getting longer
Summary
An IEEFA analysis finds that the privatization of Puerto Rico's electrical system via LUMA Energy lacks sufficient savings targets, penalties for failure, and realistic budgeting, making it unlikely to reduce costs for the public.
Key insights
- The contract between the Puerto Rico Electric Power Authority (PREPA) and LUMA Energy lacks savings targets or penalties for failing to achieve savings, providing only a small incentive for staying within budget.
- LUMA Energy expects to exceed its contractual operating budget of $135 million for the transition period by 11%. Furthermore, its three-year budget relies on unspecified "efficiencies" and "loss reduction" to avoid raising rates, with projected savings of $110 million by 2024.
- LUMA's budget is considered unrealistic because it does not account for the repayment of an $894 million loan from the Commonwealth of Puerto Rico to PREPA, which is estimated to cost at least $60 million annually over 15 years.
- The privatization may create a significant new expense for the government; because LUMA does not recognize collective bargaining agreements or automatically transfer workers, transferring the 4,500 PREPA transmission and distribution employees to other government jobs could cost approximately $200 million annually.
- Despite having responsibilities for generation planning and prioritizing new projects, LUMA faces no consequences if Puerto Rico fails to meet its renewable energy targets.
Cite the original document
- APA
- Kunkel, C. (2021). Puerto Rico’s key electrical system privatization initiative has been a longshot to save money for the people of Puerto Rico—and the odds are getting longer. Institute for Energy Economics and Financial Analysis. https://ieefa.org/resources/ieefa-savings-puerto-rico-grid-privatization-bad-start
- Chicago
- Kunkel, Cathy. Puerto Rico’s key electrical system privatization initiative has been a longshot to save money for the people of Puerto Rico—and the odds are getting longer. Institute for Energy Economics and Financial Analysis, 2021. https://ieefa.org/resources/ieefa-savings-puerto-rico-grid-privatization-bad-start.
- Wikipedia
- {{cite report |last1=Kunkel |first1=Cathy |title=Puerto Rico’s key electrical system privatization initiative has been a longshot to save money for the people of Puerto Rico—and the odds are getting longer |publisher=Institute for Energy Economics and Financial Analysis |date=8 April 2021 |url=https://ieefa.org/resources/ieefa-savings-puerto-rico-grid-privatization-bad-start |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-000140)}}
- BibTeX
- @techreport{kunkel2021puerto, author = {Kunkel, Cathy}, title = {{Puerto Rico’s key electrical system privatization initiative has been a longshot to save money for the people of Puerto Rico—and the odds are getting longer}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2021}, month = apr, url = {https://ieefa.org/resources/ieefa-savings-puerto-rico-grid-privatization-bad-start}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-000140} }
Full text
Collected · Record updated