IEEFA Argentina: Ferrocarril de Vaca Muerta, imprescindible para los planes de desarrollo
Summary
The Vaca Muerta railway project is stalled because the Argentine government failed to secure the necessary cargo commitments from foreign oil and gas companies, receiving only 3.3 million tonnes against a required 4 million tonnes.
Key insights
- The Argentine government failed to secure the minimum cargo commitments required for the Vaca Muerta railway to be economically viable, receiving 3.3 million tonnes of commitments against a requirement of at least 4 million tonnes over ten years.
- Foreign investment in the project is low due to high development costs and market conditions; only eight companies in Neuquén made cargo commitments, and major firms like ExxonMobil, Tecpetrol, and Wintershall made none.
- The project's financial structure relied on public-private partnerships (PPPs), but the program was suspended in December 2018, pausing 40 infrastructure projects and US $21 billion in investments due to rising country risk and interest rates.
- The estimated cost for the railway is US $780 million, with an additional US $500 million needed to route the train around cities to avoid dividing them.
- The semi-state company YPF provided half of the total cargo commitments, while foreign contributions were minimal, with Pan American Energy contributing US $300,000 and others contributing $150,000 or less.
Cite the original document
- APA
- Sanzillo, T., & Hipple, K. (2019). IEEFA Argentina: Ferrocarril de Vaca Muerta, imprescindible para los planes de desarrollo. Institute for Energy Economics and Financial Analysis. https://ieefa.org/resources/ieefa-argentina-ferrocarril-de-vaca-muerta-imprescindible-para-los-planes-de-desarrollo
- Chicago
- Sanzillo, Tom, and Kathy Hipple. IEEFA Argentina: Ferrocarril de Vaca Muerta, imprescindible para los planes de desarrollo. Institute for Energy Economics and Financial Analysis, 2019. https://ieefa.org/resources/ieefa-argentina-ferrocarril-de-vaca-muerta-imprescindible-para-los-planes-de-desarrollo.
- Wikipedia
- {{cite report |last1=Sanzillo |first1=Tom |last2=Hipple |first2=Kathy |title=IEEFA Argentina: Ferrocarril de Vaca Muerta, imprescindible para los planes de desarrollo |publisher=Institute for Energy Economics and Financial Analysis |date=9 May 2019 |url=https://ieefa.org/resources/ieefa-argentina-ferrocarril-de-vaca-muerta-imprescindible-para-los-planes-de-desarrollo |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-000132)}}
- BibTeX
- @techreport{sanzillo2019ieefa, author = {Sanzillo, Tom and Hipple, Kathy}, title = {{IEEFA Argentina: Ferrocarril de Vaca Muerta, imprescindible para los planes de desarrollo}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2019}, month = may, url = {https://ieefa.org/resources/ieefa-argentina-ferrocarril-de-vaca-muerta-imprescindible-para-los-planes-de-desarrollo}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-000132} }
Full text
Collected · Record updated