Santos’ proposed new Darwin Harbour pipeline: Barossa gas remains problematic

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The IEEFA briefing finds that Santos's Barossa gas project will remain one of the world's dirtiest gas projects because its total emissions will exceed its LNG production even with CCS implemented.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Implementing carbon capture and storage (CCS) for the Barossa development would result in little to no emissions reduction while increasing costs, risks, and delays.
  • The Barossa project is projected to produce more carbon dioxide emissions both offshore and onshore than the actual production of liquefied natural gas (LNG), even if CCS is successfully implemented.
  • The current Australian approval process is flawed because the National Offshore Petroleum Safety and Environmental Management Authority (NOPSEMA) and the Northern Territory Environment Protection Authority (NT EPA) assess offshore and onshore components separately, obscuring the project's total emissions intensity.

Cite the original document

APA
Robert, J. (2022). Santos’ proposed new Darwin Harbour pipeline: Barossa gas remains problematic. Institute for Energy Economics and Financial Analysis. https://ieefa.org/resources/santos-proposed-new-darwin-harbour-pipeline-barossa-gas-remains-problematic
Chicago
Robert, John. Santos’ proposed new Darwin Harbour pipeline: Barossa gas remains problematic. Institute for Energy Economics and Financial Analysis, 2022. https://ieefa.org/resources/santos-proposed-new-darwin-harbour-pipeline-barossa-gas-remains-problematic.
Wikipedia
{{cite report |last1=Robert |first1=John |title=Santos’ proposed new Darwin Harbour pipeline: Barossa gas remains problematic |publisher=Institute for Energy Economics and Financial Analysis |date=1 February 2022 |url=https://ieefa.org/resources/santos-proposed-new-darwin-harbour-pipeline-barossa-gas-remains-problematic |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-000007)}}
BibTeX
@techreport{robert2022santos, author = {Robert, John}, title = {{Santos’ proposed new Darwin Harbour pipeline: Barossa gas remains problematic}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2022}, month = feb, url = {https://ieefa.org/resources/santos-proposed-new-darwin-harbour-pipeline-barossa-gas-remains-problematic}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-000007} }

Full text

Collected · Record updated