Sasol offset implementation plan
Summary
groundWork and Friends of the Earth, South Africa reject Sasol's offset implementation plan, arguing that reducing domestic emissions does not offset industrial pollution and that the proposed projects are insufficient substitutes for regulatory compliance.
Key insights
- The authors reject the premise that reducing emissions from one source, such as domestic energy, can 'offset' emissions from another, such as industrial sources.
- The Department of Environmental Affairs allowed Sasol to postpone compliance with minimum emission standards in March 2015 in exchange for an offset programme, which the authors describe as a 'cheap option to compliance' that absolves the corporation of liability.
- The proposed RDP housing retrofit project, specifically the use of expanded polystyrene for insulation, is criticised for using toxic gases during manufacture, releasing styrene vapours, and posing a fire hazard where burning material sticks to flesh like napalm.
- The waste recycling project proposed for Zamdela, Sasolburg, is criticised for being developed without consulting the Ikageng Ditamating Recycling Cooperative and for potentially undermining the existing waste pickers' economy.
- The authors argue that Sasol's proposed dust suppression trials using a chemical stabiliser on unsurfaced roads lack detail regarding chemical composition and potential health or environmental impacts.
- The authors demand that Sasol provide a roadmap to compliance with minimum emission standards, noting that Sasol indicated at a December 3rd meeting in Sasolburg that it cannot guarantee compliance by the end of the postponement period.
Cite the original document
- APA
- groundWork (2016). Sasol offset implementation plan. https://groundwork.org.za/wp-content/uploads/2022/07/submission_29_Jan_2016.pdf
- Chicago
- groundWork. Sasol offset implementation plan. 2016. https://groundwork.org.za/wp-content/uploads/2022/07/submission_29_Jan_2016.pdf.
- Wikipedia
- {{cite press release |author=groundWork |title=Sasol offset implementation plan |date=29 January 2016 |url=https://groundwork.org.za/wp-content/uploads/2022/07/submission_29_Jan_2016.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document gwza-000160)}}
- BibTeX
- @misc{groundwork2016sasol, author = {{groundWork}}, title = {{Sasol offset implementation plan}}, publisher = {groundWork}, year = {2016}, month = jan, url = {https://groundwork.org.za/wp-content/uploads/2022/07/submission_29_Jan_2016.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document gwza-000160} }
Full text
Collected · Record updated