INTEGRATED RESOURCE PLAN 2019 AND THE MINISTERIAL DETERMINATION ON THE PROCUREMENT OF NEW GENERATION CAPACITY FROM RENEWABLES, STORAGE, GAS AND COAL
Summary
The Centre for Environmental Rights, representing environmental justice organisations, is urging the South African government to update the Integrated Resource Plan 2019 and remove provisions for 1500 MW of new coal-fired power capacity.
Key insights
- The clients of the Centre for Environmental Rights strongly object to the inclusion of any new fossil fuel generation capacity in the Integrated Resource Plan for Electricity, 2019 (IRP) and the ministerial determination of 25 September 2020, specifically citing the provision for 1500 MW of new coal capacity.
- The authors argue that the IRP 2019 requires an update because President Ramaphosa announced on 10 June 2021 that the Electricity Regulation Act, 2006 (ERA) would be amended to allow projects up to 100 MW to generate electricity without a NERSA licence, potentially unlocking over 5000 MW of embedded generation capacity not currently in the plan.
- The Centre for Environmental Rights contends that the written reasons provided by the Department for the determination and NERSA's concurrence are not reasonable, rational, or lawful.
Cite the original document
- APA
- groundWork (2021). INTEGRATED RESOURCE PLAN 2019 AND THE MINISTERIAL DETERMINATION ON THE PROCUREMENT OF NEW GENERATION CAPACITY FROM RENEWABLES, STORAGE, GAS AND COAL. https://groundwork.org.za/wp-content/uploads/2022/08/CER-letter-to-Minister-Mantashe-NERSA-090721.pdf
- Chicago
- groundWork. INTEGRATED RESOURCE PLAN 2019 AND THE MINISTERIAL DETERMINATION ON THE PROCUREMENT OF NEW GENERATION CAPACITY FROM RENEWABLES, STORAGE, GAS AND COAL. 2021. https://groundwork.org.za/wp-content/uploads/2022/08/CER-letter-to-Minister-Mantashe-NERSA-090721.pdf.
- Wikipedia
- {{cite press release |author=groundWork |title=INTEGRATED RESOURCE PLAN 2019 AND THE MINISTERIAL DETERMINATION ON THE PROCUREMENT OF NEW GENERATION CAPACITY FROM RENEWABLES, STORAGE, GAS AND COAL |date=9 July 2021 |url=https://groundwork.org.za/wp-content/uploads/2022/08/CER-letter-to-Minister-Mantashe-NERSA-090721.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document gwza-000069)}}
- BibTeX
- @misc{groundwork2021integrated, author = {{groundWork}}, title = {{INTEGRATED RESOURCE PLAN 2019 AND THE MINISTERIAL DETERMINATION ON THE PROCUREMENT OF NEW GENERATION CAPACITY FROM RENEWABLES, STORAGE, GAS AND COAL}}, publisher = {groundWork}, year = {2021}, month = jul, url = {https://groundwork.org.za/wp-content/uploads/2022/08/CER-letter-to-Minister-Mantashe-NERSA-090721.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document gwza-000069} }
Full text
Collected · Record updated