Request for Proposal: SIDAFF 03/2025 Provision of Services for Project Preparation Activities in Saldanha Bay Municipality
Summary
This Request for Proposal (RFP), issued by the GreenCape Sector Development Agency on 29 August 2025, seeks a Professional Service Provider (PSP) to conduct project preparation activities for three infrastructure projects in the Saldanha Bay Municipality. The work is part of the Sustainable Infrastructure Development and Financial Facility (SIDAFF) Programme, which is funded by international donors including the Swiss State Secretariat for Economic Affairs (SECO) and Impact Fund Denmark (IFD). The PSP will guide projects from initiation through to documentation and procurement, ensuring compliance with both South African law and international standards, specifically the International Finance Corporation's (IFC) Performance Standards and World Bank Environmental and Social Standards.
Key insights
- The scope of work comprises three specific infrastructure projects in the Saldanha Bay Municipality: Project A involves the upgrading and refurbishment of the Vredenburg Wastewater Treatment Works (WWTW) with an estimated cost of R41,000,000; Project B is the upgrade of the supply line to Langebaan with an estimated cost of R89,000,000; and Project C is the design of the Louwville reservoir and bulk supply main with an estimated cost of R35,000,000.
- The Vredenburg WWTW (Project A) currently operates at approximately 2,850 m3/d, which is 57% of its average daily wastewater flow (ADWF), and struggles to meet Department of Water and Sanitation (DWS) general limits due to process bottlenecks, insufficient settling capacity, and insufficient aeration.
- Project B aims to address capacity limits in Langebaan where the existing 400 mm diameter "WCF" pipeline is near capacity. The peak monthly demand for a fully occupied Langebaan is calculated at 13,700 kL/d, while the existing pipeline capacity is 13,800 kL/d.
- Project C involves designing a new 6 ML reinforced concrete reservoir adjacent to an existing 3 ML reservoir to increase storage and improve distribution in Louwville, where future demand is projected to reach 7,378 kL/day from a current average annual daily demand (AADD) of 3,250 kL/day.
- The procurement approach uses a phased payment structure based on ECSA stages. Stages 1, 2a, and 2b are costed as a fixed fee. Progression to Stages 3 (Detailed Design) and 4 (Documentation and Procurement) is contingent upon the completion and evaluation of the first stages and a feasibility decision by GreenCape.
- Tender evaluation is based on a weighted score: 50 points for technical evaluation (functionality), 30 points for financial evaluation, and 20 points for B-BBEE status. A minimum technical score of 80% (40 out of 50) is required to proceed to the financial evaluation.
- The technical evaluation specifically assesses key personnel, the tenderer's experience over the last 10 years, the technical approach, and the sustainability of the offer. A sustainability motivation is mandatory if the tenderer offers a discount of more than 10% of the prescribed ECSA rates.
Cite the original document
- APA
- GreenCape (2025). Request for Proposal: SIDAFF 03/2025 Provision of Services for Project Preparation Activities in Saldanha Bay Municipality. https://greencape.co.za/wp-content/uploads/2025/08/GreenCape_Request-for-Proposal_Terms-of-Reference_SIDAFF_Saldanha_final.pdf
- Chicago
- GreenCape. Request for Proposal: SIDAFF 03/2025 Provision of Services for Project Preparation Activities in Saldanha Bay Municipality. 2025. https://greencape.co.za/wp-content/uploads/2025/08/GreenCape_Request-for-Proposal_Terms-of-Reference_SIDAFF_Saldanha_final.pdf.
- Wikipedia
- {{cite report |author=GreenCape |title=Request for Proposal: SIDAFF 03/2025 Provision of Services for Project Preparation Activities in Saldanha Bay Municipality |date=29 August 2025 |url=https://greencape.co.za/wp-content/uploads/2025/08/GreenCape_Request-for-Proposal_Terms-of-Reference_SIDAFF_Saldanha_final.pdf |access-date=17 August 2026 |via=Climate Insights Directory}}
- BibTeX
- @techreport{greencape2025request, author = {{GreenCape}}, title = {{Request for Proposal: SIDAFF 03/2025 Provision of Services for Project Preparation Activities in Saldanha Bay Municipality}}, institution = {GreenCape}, year = {2025}, month = aug, url = {https://greencape.co.za/wp-content/uploads/2025/08/GreenCape_Request-for-Proposal_Terms-of-Reference_SIDAFF_Saldanha_final.pdf}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }
Full text
Collected · Record updated