WASTE TO RESOURCES: IMPLEMENTING CIRCULAR ECONOMY SOLUTIONS IN RWANDA, SENEGAL AND UGANDA

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The report details GGGI's efforts to implement circular economy solutions in Rwanda, Senegal, and Uganda, focusing on various waste streams including plastics, organic waste, e-waste, and fecal sludge. In Rwanda, the project established valorization infrastructure in Kigali, including a sorting facility and bio-waste treatment, aiming to valorize 35,000 tons of waste annually. In Senegal, interventions spanned three cities: a plastic recycling facility in Touba, an upgraded e-waste unit in Dakar, and a fecal sludge treatment plant in Tivaouane. In Uganda, the focus was on policy and planning for the Greater Kampala Metropolitan Area, specifically Mukono Municipality, producing strategies and feasibility studies for waste and sludge treatment. Key findings emphasize the necessity of source segregation, the high proportion of organic waste in municipal streams, and the need for Extended Producer Responsibility (EPR) frameworks to ensure financial sustainability.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • In Rwanda, the 'Waste to Resources' project established infrastructure in Kigali including a waste sorting and separation facility, a bio-waste treatment facility, and a truck weighbridge, creating the capacity to valorize up to 35,000 tons of waste per year and avoid 15,320 tCO2eq of GHG emissions annually.
  • A waste characterization study in Kigali, Rwanda, found that municipal solid waste is predominantly organic (78%), followed by plastic (6.9%) and paper (5.5%), while e-waste was found in negligible amounts, suggesting consumers store non-functioning equipment at home.
  • In Senegal, the project implemented city-specific solutions: a plastic recycling facility in Touba capable of treating 936 tons of LDPE per year, an upgraded e-waste dismantling unit in Dakar increasing capacity to 260 tons per year, and an upgraded fecal sludge treatment plant (FSTP) in Tivaouane.
  • Senegal's e-waste management is currently hindered by a lack of specific policies, though the project drafted an e-waste decree that includes an Extended Producer Responsibility (EPR) mechanism, which is estimated to potentially generate USD 15 million annually.
  • In Uganda, the project focused on the Mukono Municipality within the Greater Kampala Metropolitan Area, developing a 10-year FSM improvement strategy (2023-2033) and an MSW management strategy, alongside feasibility studies for a waste sorting facility and an FSTP.
  • Waste characterization in Mukono, Uganda, revealed that organic waste comprises the largest portion of municipal waste at 83.66%, with plastics at 6.83% and paper at 1.82%.
  • A critical barrier to efficient recycling across all three countries is the lack of source segregation, which increases processing costs and causes cross-contamination in sorting facilities.
  • Financial sustainability for waste processing facilities, particularly FSTPs and composting plants, often requires government intervention through adjusted disposal fees or compensatory subsidies because product sales alone typically do not cover operational costs.
  • Gender assessments in Rwanda indicated that women are predominantly concentrated in low-income, unskilled stages of the solid waste management value chain, leading to recommendations for a 'Gender Equality Seal' for private companies.

Cite the original document

APA
Fakhry, J., Suh, J., Mukurarinda, J., Faye, A., & Toovey, D. (2025). WASTE TO RESOURCES: IMPLEMENTING CIRCULAR ECONOMY SOLUTIONS IN RWANDA, SENEGAL AND UGANDA. Global Green Growth Institute. https://gggi.org/wp-content/uploads/2025/06/Waste-to-Resources-Booklet-Final-version.pdf
Chicago
Fakhry, Jerome, Jiye Suh, Juvenal Mukurarinda, Abdoulaye Faye, and David Toovey. WASTE TO RESOURCES: IMPLEMENTING CIRCULAR ECONOMY SOLUTIONS IN RWANDA, SENEGAL AND UGANDA. Global Green Growth Institute, 2025. https://gggi.org/wp-content/uploads/2025/06/Waste-to-Resources-Booklet-Final-version.pdf.
Wikipedia
{{cite report |last1=Fakhry |first1=Jerome |last2=Suh |first2=Jiye |last3=Mukurarinda |first3=Juvenal |last4=Faye |first4=Abdoulaye |last5=Toovey |first5=David |title=WASTE TO RESOURCES: IMPLEMENTING CIRCULAR ECONOMY SOLUTIONS IN RWANDA, SENEGAL AND UGANDA |publisher=Global Green Growth Institute |date=June 2025 |url=https://gggi.org/wp-content/uploads/2025/06/Waste-to-Resources-Booklet-Final-version.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document gggi-000816)}}
BibTeX
@techreport{fakhry2025waste, author = {Fakhry, Jerome and Suh, Jiye and Mukurarinda, Juvenal and Faye, Abdoulaye and Toovey, David}, title = {{WASTE TO RESOURCES: IMPLEMENTING CIRCULAR ECONOMY SOLUTIONS IN RWANDA, SENEGAL AND UGANDA}}, institution = {Global Green Growth Institute}, year = {2025}, month = jun, url = {https://gggi.org/wp-content/uploads/2025/06/Waste-to-Resources-Booklet-Final-version.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document gggi-000816} }

Full text

Collected · Record updated