The report analyzes the power sector of Oriental Mindoro, which is heavily dependent on diesel (nearly 60% of supply) and faces high electricity rates. It proposes the installation of rooftop solar PV in public buildings to create public value through GHG emission reductions, green job creation, and lower power costs. Using the Provincial Capitol Complex Main Building as a case study, the report evaluates two options: a 100 kW net-metered system and a 300 kW own-use system, both showing a break-even period of eight years and an internal rate of return of 12%. The document recommends that the Provincial Government of Oriental Mindoro (PGOM) institutionalize a clean energy agenda via provincial ordinance, improve the technical capacity of the local utility ORMECO to support net-metering, and explore financing through government loans or public-private partnerships (PPP).

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Oriental Mindoro's power supply is dominated by diesel-fired plants, which account for nearly 60% (51.4 MW) of the 86.5 MW total contracted capacity as of 2020, with hydro (22%) and wind (18.5%) providing the remainder.
  • Electricity prices in Oriental Mindoro are the highest among all provinces in the MIMAROPA Region, despite generation rates being subsidized by 48% through the universal charge.
  • Energy demand in the province is projected to grow by 7% annually until 2028, with residential consumers representing the largest share of revenue at 57.44%.
  • A case study of the Provincial Capitol Complex Main Building indicates that a 100 kW net-metered solar PV system could generate approximately 110 MWh per year, resulting in first-year savings of PHP 1.040 million.
  • Financial analysis of both a 100 kW net-metered and a 300 kW own-use solar PV system for the Capitol Main Building shows a break-even period of eight years and an internal rate of return (IRR) of 12%.
  • The report identifies a significant solar potential in the region, with Central Oriental Mindoro estimated at 130 MW and the southern part of Mindoro Island at 213 MW.
  • Financing options for the project include government loans from the Development Bank of the Philippines (DBP) and Land Bank of the Philippines (LBP), or Public-Private Partnerships (PPP) using models such as Build-Operate-Transfer (BOT).
  • The report recommends that PGOM enact a provincial ordinance to institutionalize a clean energy agenda and develop a Local Renewable Energy Plan (LREP) to roadmap energy supply against economic targets.

Cite the original document

APA
Global Green Growth Institute (2021). Unleashing the Potential of Rooftop Solar PV in Oriental Mindoro, Philippines. https://gggi.org/wp-content/uploads/2021/09/PH-OM-Solar-Report-21.09.03.pdf
Chicago
Global Green Growth Institute. Unleashing the Potential of Rooftop Solar PV in Oriental Mindoro, Philippines. 2021. https://gggi.org/wp-content/uploads/2021/09/PH-OM-Solar-Report-21.09.03.pdf.
Wikipedia
{{cite report |author=Global Green Growth Institute |title=Unleashing the Potential of Rooftop Solar PV in Oriental Mindoro, Philippines |date=August 2021 |url=https://gggi.org/wp-content/uploads/2021/09/PH-OM-Solar-Report-21.09.03.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document gggi-000700)}}
BibTeX
@techreport{globalgreengrowthinstitute2021unleashing, author = {{Global Green Growth Institute}}, title = {{Unleashing the Potential of Rooftop Solar PV in Oriental Mindoro, Philippines}}, institution = {Global Green Growth Institute}, year = {2021}, month = aug, url = {https://gggi.org/wp-content/uploads/2021/09/PH-OM-Solar-Report-21.09.03.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document gggi-000700} }

Full text

Collected · Record updated