TErm Plus Tonga Energy Road MaP 2021–2035
Summary
The TERMPLUS 2021–2035 outlines a transition for Tonga to reach 70% renewable electricity by 2025 and 100% by 2035, while simultaneously targeting a 10% reduction in net oil imports by 2035.
Key insights
- Tonga aims to increase the share of electricity generated from renewable sources to 70% by 2025 and reach an ultimate goal of 100% renewable electricity by 2035.
- The roadmap sets a target to reduce the total amount of net oil product imports by 10% by 2035 compared to 2018 levels.
- To strengthen energy security, Tonga intends to expand storage facilities for motor gasoline and diesel to hold volumes equivalent to 45 days of net imports.
- Tonga plans to establish direct shipments of oil products from Singapore using medium-range tankers to bypass Fiji and make the supply chain more robust.
- The roadmap targets limiting the growth of oil consumption for road transport to 25% for the period 2019–2035, averaging 1.4% per year.
- Tonga aims to limit the growth of grid-connected residential electricity end-use to an average of 1% per year from 2019 to 2035 through measures like minimum energy performance standards and solar water heating.
- The transition to 100% renewable electricity by 2035 will likely require new primary sources of firm renewable energy, such as biofuels, biomass, geothermal, or ocean energy, and advanced storage technologies.
- Tonga's electricity networks have successfully reduced line losses from a baseline of 18% to below 9%, with a further target to maintain them under 8% through 2035.
- The transport sector is the largest energy consumer in Tonga, accounting for 62% of total annual energy consumption and approximately 90% of end-use petroleum oil demand.
- The roadmap identifies the 'Motor industry quality assurance programme' and 'Stricter emission standards' as the highest priority interventions for the transport sector based on Multi-Criteria Analysis.
- Tonga's energy sector is highly vulnerable to physical shocks, particularly tropical cyclones, which threaten above-ground transmission and distribution lines.
- The roadmap emphasizes gender mainstreaming to address barriers for women in the energy sector, aiming for gender equity by 2025.
Cite the original document
- APA
- Global Green Growth Institute (n.d.). TErm Plus Tonga Energy Road MaP 2021–2035. https://gggi.org/wp-content/uploads/2024/04/GGGI_Tonga-Energy-TERMPlus_2021_2035.pdf
- Chicago
- Global Green Growth Institute. TErm Plus Tonga Energy Road MaP 2021–2035. n.d. https://gggi.org/wp-content/uploads/2024/04/GGGI_Tonga-Energy-TERMPlus_2021_2035.pdf.
- Wikipedia
- {{cite report |author=Global Green Growth Institute |title=TErm Plus Tonga Energy Road MaP 2021–2035 |url=https://gggi.org/wp-content/uploads/2024/04/GGGI_Tonga-Energy-TERMPlus_2021_2035.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document gggi-000529)}}
- BibTeX
- @techreport{globalgreengrowthinstitutendterm, author = {{Global Green Growth Institute}}, title = {{TErm Plus Tonga Energy Road MaP 2021–2035}}, institution = {Global Green Growth Institute}, url = {https://gggi.org/wp-content/uploads/2024/04/GGGI_Tonga-Energy-TERMPlus_2021_2035.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document gggi-000529} }
Full text
Collected · Record updated