Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The TERMPLUS 2021–2035 outlines a transition for Tonga to reach 70% renewable electricity by 2025 and 100% by 2035, while simultaneously targeting a 10% reduction in net oil imports by 2035.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Tonga aims to increase the share of electricity generated from renewable sources to 70% by 2025 and reach an ultimate goal of 100% renewable electricity by 2035.
  • The roadmap sets a target to reduce the total amount of net oil product imports by 10% by 2035 compared to 2018 levels.
  • To strengthen energy security, Tonga intends to expand storage facilities for motor gasoline and diesel to hold volumes equivalent to 45 days of net imports.
  • Tonga plans to establish direct shipments of oil products from Singapore using medium-range tankers to bypass Fiji and make the supply chain more robust.
  • The roadmap targets limiting the growth of oil consumption for road transport to 25% for the period 2019–2035, averaging 1.4% per year.
  • Tonga aims to limit the growth of grid-connected residential electricity end-use to an average of 1% per year from 2019 to 2035 through measures like minimum energy performance standards and solar water heating.
  • The transition to 100% renewable electricity by 2035 will likely require new primary sources of firm renewable energy, such as biofuels, biomass, geothermal, or ocean energy, and advanced storage technologies.
  • Tonga's electricity networks have successfully reduced line losses from a baseline of 18% to below 9%, with a further target to maintain them under 8% through 2035.
  • The transport sector is the largest energy consumer in Tonga, accounting for 62% of total annual energy consumption and approximately 90% of end-use petroleum oil demand.
  • The roadmap identifies the 'Motor industry quality assurance programme' and 'Stricter emission standards' as the highest priority interventions for the transport sector based on Multi-Criteria Analysis.
  • Tonga's energy sector is highly vulnerable to physical shocks, particularly tropical cyclones, which threaten above-ground transmission and distribution lines.
  • The roadmap emphasizes gender mainstreaming to address barriers for women in the energy sector, aiming for gender equity by 2025.

Cite the original document

APA
Global Green Growth Institute (n.d.). TErm Plus Tonga Energy Road MaP 2021–2035. https://gggi.org/wp-content/uploads/2024/04/GGGI_Tonga-Energy-TERMPlus_2021_2035.pdf
Chicago
Global Green Growth Institute. TErm Plus Tonga Energy Road MaP 2021–2035. n.d. https://gggi.org/wp-content/uploads/2024/04/GGGI_Tonga-Energy-TERMPlus_2021_2035.pdf.
Wikipedia
{{cite report |author=Global Green Growth Institute |title=TErm Plus Tonga Energy Road MaP 2021–2035 |url=https://gggi.org/wp-content/uploads/2024/04/GGGI_Tonga-Energy-TERMPlus_2021_2035.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document gggi-000529)}}
BibTeX
@techreport{globalgreengrowthinstitutendterm, author = {{Global Green Growth Institute}}, title = {{TErm Plus Tonga Energy Road MaP 2021–2035}}, institution = {Global Green Growth Institute}, url = {https://gggi.org/wp-content/uploads/2024/04/GGGI_Tonga-Energy-TERMPlus_2021_2035.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document gggi-000529} }

Full text

Collected · Record updated