GGGI Rwanda: Fact Sheet Green Certification of the New Bugesera International Airport

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The New Bugesera International Airport is pursuing Green Mark certification and aims to be the first airport in East Africa to achieve green building certification.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The project aims to achieve an energy savings target of 20% through value engineering and optimization of the base design.
  • Water efficiency measures aim to achieve a 60% portable water savings target by analyzing plumbing fixtures and systems.
  • The airport is registered for certification under the Green Mark Rating System administered by the Building Control Authority (BCA) of Singapore and is part of the pilot for the Rwanda Green Building Minimum Compliance System.
  • If successful, the New Bugesera International Airport would be the first airport in East Africa to receive green building certification.

Cite the original document

APA
Global Green Growth Institute (n.d.). GGGI Rwanda: Fact Sheet Green Certification of the New Bugesera International Airport. https://gggi.org/wp-content/uploads/2019/04/Certification-of-Bugesera-Airport-Fact-Sheet_FINAL.pdf
Chicago
Global Green Growth Institute. GGGI Rwanda: Fact Sheet Green Certification of the New Bugesera International Airport. n.d. https://gggi.org/wp-content/uploads/2019/04/Certification-of-Bugesera-Airport-Fact-Sheet_FINAL.pdf.
Wikipedia
{{cite report |author=Global Green Growth Institute |title=GGGI Rwanda: Fact Sheet Green Certification of the New Bugesera International Airport |url=https://gggi.org/wp-content/uploads/2019/04/Certification-of-Bugesera-Airport-Fact-Sheet_FINAL.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document gggi-000255)}}
BibTeX
@techreport{globalgreengrowthinstitutendgggi, author = {{Global Green Growth Institute}}, title = {{GGGI Rwanda: Fact Sheet Green Certification of the New Bugesera International Airport}}, institution = {Global Green Growth Institute}, url = {https://gggi.org/wp-content/uploads/2019/04/Certification-of-Bugesera-Airport-Fact-Sheet_FINAL.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document gggi-000255} }

Full text

Collected · Record updated