Germanwatch critiques the draft scenario framework for Germany's 2015 Electricity Grid Development Plan (NEP), arguing that the current approach by transmission system operators (TSOs) is too narrow and fails to align with national climate targets. The organization specifically opposes coupling the lifespan of lignite power plants to open-cast mine permits, as this leads to increased lignite capacity assumptions. Germanwatch advocates for a broader 'scenario funnel' that reflects a climate-politically desirable future rather than just a probable one, and suggests adopting a more flexible methodology proposed by Agora Energiewende. While praising new efforts in public transparency and regionalization methods based on land availability, Germanwatch calls for a two-year planning cycle to allow for deeper civil society engagement and more rigorous sensitivity testing regarding CO2 pricing and the reduction of 'must-run' coal capacities.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The current methodological approach of transmission system operators (TSOs) to align scenario selection closely with the expansion corridor of the 2014 EEG amendment is insufficient for the goal of decarbonizing energy systems.
  • Germanwatch rejects the TSOs' proposal to link the operational lifespan of lignite power plants to the duration of their associated open-cast mine permits, noting that this results in increased lignite capacity assumptions across all 2025 scenarios compared to 2024 assumptions.
  • The organization argues that scenario selection should not be based on a narrow definition of probability but should instead reflect a climate-politically desired future to ensure national energy and climate goals are met.
  • Germanwatch supports the alternative methodology proposed by Agora Energiewende/BET, which incorporates additional variable input parameters—such as regional distribution of renewable generation and CO2 price developments—to better inform political decisions on the energy transition.
  • To improve civil society participation and allow for a more intensive discussion on planning alternatives, Germanwatch demands that the planning and consultation cycle be extended to a two-year rhythm.
  • The document calls for specific sensitivity tests in the NEP 2025, including the impact of higher CO2 prices to replace coal with gas, the reduction of 'must-run' coal capacities, and the effects of demand-side management.
  • Germanwatch opposes using the 'capping of onshore wind feed-in peaks' as a planning basis unless other instruments for the flexibilization and emission reduction of coal power plants are first introduced.
  • The new regionalization methodology for onshore wind and photovoltaics, which bases expansion assumptions primarily on land availability, is viewed positively by Germanwatch.

Cite the original document

APA
Germanwatch (2014). Stellungnahme zum „Szenariorahmen für die Netzentwicklungspläne Strom 2015 – Entwurf der Übertragungsnetzbetreiber“ vom 30. April 2014. https://www.germanwatch.org/sites/default/files/announcement/9327.pdf
Chicago
Germanwatch. Stellungnahme zum „Szenariorahmen für die Netzentwicklungspläne Strom 2015 – Entwurf der Übertragungsnetzbetreiber“ vom 30. April 2014. 2014. https://www.germanwatch.org/sites/default/files/announcement/9327.pdf.
Wikipedia
{{cite press release |author=Germanwatch |title=Stellungnahme zum „Szenariorahmen für die Netzentwicklungspläne Strom 2015 – Entwurf der Übertragungsnetzbetreiber“ vom 30. April 2014 |date=1 June 2014 |url=https://www.germanwatch.org/sites/default/files/announcement/9327.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document gerwat-001379)}}
BibTeX
@misc{germanwatch2014stellungnahme, author = {{Germanwatch}}, title = {{Stellungnahme zum „Szenariorahmen für die Netzentwicklungspläne Strom 2015 – Entwurf der Übertragungsnetzbetreiber“ vom 30. April 2014}}, publisher = {Germanwatch}, year = {2014}, month = jun, url = {https://www.germanwatch.org/sites/default/files/announcement/9327.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document gerwat-001379} }

Full text

Collected · Record updated