Stellungnahme zum Netzentwicklungsplan Strom 2013 – Entwurf der Übertragungsnetzbetreiber
Summary
Germanwatch argues that the NEP 2013 draft is overdimensioned and biased toward coal power, calling for a revision of grid expansion needs based on a transition to nearly 100% renewable energy by 2050.
Key insights
- The NEP 2013 draft proposes a grid designed to be "congestion-free" and integrate the "last kilowatt hour," which Germanwatch considers overdimensioned and potentially aligned with outdated coal-based energy structures.
- The draft shows a 5% increase in grid expansion needs compared to the previous year, despite a relatively similar scenario framework between 2012 and 2013.
- The NEP 2013 exhibits a "coal bias," with projected full-load hours for lignite and hard coal remaining very high or even increasing in long-term scenarios, which contradicts climate goals and market expectations.
- Germanwatch argues that the current prioritization of measures is insufficient because the number of "urgent" (vordringlich) measures is too high to constitute a real prioritization.
- The document identifies a lack of transparency in the NEP 2013, noting that tables are not comparable and the distinction between "start network" and "target network" is unclear.
- Public participation processes are criticized for being too formal and failing to incorporate substantive feedback on methodology, creating the impression that only "model-inherent" comments are considered.
Cite the original document
- APA
- Germanwatch (2013). Stellungnahme zum Netzentwicklungsplan Strom 2013 – Entwurf der Übertragungsnetzbetreiber. https://www.germanwatch.org/sites/default/files/announcement/7585.pdf
- Chicago
- Germanwatch. Stellungnahme zum Netzentwicklungsplan Strom 2013 – Entwurf der Übertragungsnetzbetreiber. 2013. https://www.germanwatch.org/sites/default/files/announcement/7585.pdf.
- Wikipedia
- {{cite press release |author=Germanwatch |title=Stellungnahme zum Netzentwicklungsplan Strom 2013 – Entwurf der Übertragungsnetzbetreiber |date=April 2013 |url=https://www.germanwatch.org/sites/default/files/announcement/7585.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document gerwat-001264)}}
- BibTeX
- @misc{germanwatch2013stellungnahme, author = {{Germanwatch}}, title = {{Stellungnahme zum Netzentwicklungsplan Strom 2013 – Entwurf der Übertragungsnetzbetreiber}}, publisher = {Germanwatch}, year = {2013}, month = apr, url = {https://www.germanwatch.org/sites/default/files/announcement/7585.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document gerwat-001264} }
Full text
Collected · Record updated