Stellungnahme zum Netzentwicklungsplan Strom sowie zum Umweltbericht 2012

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

Germanwatch argues that the 2012 Power Grid Development Plan lacks necessary quantitative analysis of alternatives to grid expansion, such as load management and storage, and urges the Federal Network Agency to prioritize only the most urgent projects.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Germanwatch asserts that the legitimacy of the power grid expansion depends on a quantitative investigation of alternatives and sensitivities, which has not yet occurred. Specifically, they call for analyzing the effects of targeted generation management (capping peaks to a loss of no more than 1-2% of annual renewable energy work) and load management (calculating for an annual electricity demand of 500 TWh and a peak load of 70GW).
  • The organization recommends that the Federal Network Agency prioritize projects for the federal requirements plan, approving only those whose construction must begin within the next three years. This is based on the view that the full scale of proposed new lines—3,800km in new corridors and 2,800km in existing corridors under Scenario B—is not realistically feasible within three years.
  • Germanwatch argues that the Strategic Environmental Assessment (SEA) is currently insufficient because it focuses on individual lines rather than comparing overall plan concepts and alternatives to minimize impacts on humans and nature, which is required by European law.
  • The document criticizes the lack of transparency in the transmission system operators' (TSO) modeling, specifically noting that the derivation of individual expansion measures via the identification of grid bottlenecks has not been provided, and that relying on a single hour of the year 2022 for necessity checks is insufficient.

Cite the original document

APA
Germanwatch (2012). Stellungnahme zum Netzentwicklungsplan Strom sowie zum Umweltbericht 2012. https://www.germanwatch.org/sites/default/files/announcement/6994.pdf
Chicago
Germanwatch. Stellungnahme zum Netzentwicklungsplan Strom sowie zum Umweltbericht 2012. 2012. https://www.germanwatch.org/sites/default/files/announcement/6994.pdf.
Wikipedia
{{cite press release |author=Germanwatch |title=Stellungnahme zum Netzentwicklungsplan Strom sowie zum Umweltbericht 2012 |date=31 October 2012 |url=https://www.germanwatch.org/sites/default/files/announcement/6994.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document gerwat-001230)}}
BibTeX
@misc{germanwatch2012stellungnahme, author = {{Germanwatch}}, title = {{Stellungnahme zum Netzentwicklungsplan Strom sowie zum Umweltbericht 2012}}, publisher = {Germanwatch}, year = {2012}, month = oct, url = {https://www.germanwatch.org/sites/default/files/announcement/6994.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document gerwat-001230} }

Full text

Collected · Record updated