EnErgiEwEndE und bürgErbEtEiligung: ÖffEntlichE AkzEptAnz von infrAstrukturprojEktEn Am bEispiEl dEr „thüringEr strombrückE“
Summary
This report examines the 380-kV power line expansion in Thuringia and finds that the lack of transparency and the legal pre-determination of the project's necessity significantly undermined public acceptance.
Key insights
- The legal pre-determination of the project's necessity in the Energieleitungsausbaugesetz (EnLAG) effectively suppressed the discursive exchange of arguments regarding whether the 380-kV line was actually required.
- Public acceptance was severely hindered by an information imbalance, as the project developer (50Hertz/Vattenfall) was the primary source of data, leading to a loss of trust when information was perceived as insufficient or misleading.
- Formal participation processes, such as the Raumordnungsverfahren (ROV) and Planfeststellungsverfahren (PFV), failed to activate a broad section of the public because they relied primarily on official gazettes (Amtsblätter) which are rarely read by citizens.
- While the fundamental necessity of the project remained contested, the processes were successful in achieving local acceptance for the 'how' of the project, specifically regarding the optimization of the route and the choice of technology.
- The dena-Netzstudie II was criticized by TU Berlin (on behalf of WWF Germany) for having an information asymmetry where network operators controlled the data and model calculations, failing the state's responsibility for infrastructure design.
- Informal processes, driven by citizen initiatives and the 'Achtung Hochspannung' interest group, were more effective at activating the public and forcing the project developer to acknowledge the technical feasibility of alternative proposals.
- The report recommends that for future projects, the necessity of specific lines should not be legally fixed in advance but argued within the Planfeststellungsverfahren (PFV) to allow for genuine deliberation.
Cite the original document
- APA
- Schnelle, K., & Voigt, M. (2012). EnErgiEwEndE und bürgErbEtEiligung: ÖffEntlichE AkzEptAnz von infrAstrukturprojEktEn Am bEispiEl dEr „thüringEr strombrückE“. Germanwatch. https://www.germanwatch.org/sites/default/files/publication/4136.pdf
- Chicago
- Schnelle, Kerstin, and Matthias Voigt. EnErgiEwEndE und bürgErbEtEiligung: ÖffEntlichE AkzEptAnz von infrAstrukturprojEktEn Am bEispiEl dEr „thüringEr strombrückE“. Germanwatch, 2012. https://www.germanwatch.org/sites/default/files/publication/4136.pdf.
- Wikipedia
- {{cite report |last1=Schnelle |first1=Kerstin |last2=Voigt |first2=Matthias |title=EnErgiEwEndE und bürgErbEtEiligung: ÖffEntlichE AkzEptAnz von infrAstrukturprojEktEn Am bEispiEl dEr „thüringEr strombrückE“ |publisher=Germanwatch |date=April 2012 |url=https://www.germanwatch.org/sites/default/files/publication/4136.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document gerwat-001186)}}
- BibTeX
- @techreport{schnelle2012energiewende, author = {Schnelle, Kerstin and Voigt, Matthias}, title = {{EnErgiEwEndE und bürgErbEtEiligung: ÖffEntlichE AkzEptAnz von infrAstrukturprojEktEn Am bEispiEl dEr „thüringEr strombrückE“}}, institution = {Germanwatch}, year = {2012}, month = apr, url = {https://www.germanwatch.org/sites/default/files/publication/4136.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document gerwat-001186} }
Full text
Collected · Record updated