Browse all documents

Despite a record year, India needs to double renewables deployment by 2030 to meet energy targets

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

A briefing by Global Energy Monitor analyzing India's power capacity additions in 2024 and the trajectory required to meet its 2030 non-fossil power target of 500 GW.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • India achieved a record 34.7 GW of power capacity additions in 2024, surpassing the previous record of 2015 by 3.5 GW. Solar photovoltaic (PV) technology was the primary driver, accounting for 71% of all power sector additions and 86% of the 28.6 GW of renewable capacity added that year.
  • Despite record capacity additions, fossil fuels continued to dominate power generation in 2024, contributing more than two-thirds of the total increase in generation and maintaining a 75% share of the total. This was largely due to coal fleet utilization rates averaging nearly 70%, the highest level in a decade.
  • India is unlikely to meet its 2030 target of 500 GW of non-fossil power capacity if current deployment rates continue. Replicating 2024's annual wind and solar deployment would result in a renewables fleet of 378 GW by 2030, leaving a shortfall of approximately 100 GW. To close this gap, annual capacity additions must grow by about 15% year-on-year or average 60% higher than 2024 levels.
  • The combined capacity of hydropower, utility-scale solar, and wind projects currently in development is projected to overtake operating coal capacity within two years. Utility-scale solar projects in development total 103 GW, while coal projects in development total 111 GW.
  • Renewable energy deployment is geographically concentrated. Six states—Rajasthan, Gujarat, Maharashtra, Tamil Nadu, Madhya Pradesh, and Karnataka—accounted for 89% of 2024 wind and solar additions and two-thirds of all national renewable capacity. Rajasthan hosts 27% (26.5 GW) of India's total solar PV fleet, including the 2.7 GW Bhadla complex.
  • Wind capacity reached 48 GW by the end of 2024, becoming the third-largest power source by operating capacity. However, growth has been hindered by land acquisition and rights issues, supply chain constraints, and an unsustainable tariff system.
  • Achieving the 2030 targets requires overcoming several barriers, including insufficient energy storage and electricity transmission infrastructure, high financing costs for developers, and non-compliance with renewables purchasing obligations. Just transition challenges include livelihood impacts on coal workers and conflicts over land rights for local communities and farmers.

Cite the original document

APA
Global Energy Monitor (2025). Despite a record year, India needs to double renewables deployment by 2030 to meet energy targets. https://globalenergymonitor.org/sites/default/files/migration/reports/GEM-India-FFvsRES-February-2025_11.pdf
Chicago
Global Energy Monitor. Despite a record year, India needs to double renewables deployment by 2030 to meet energy targets. 2025. https://globalenergymonitor.org/sites/default/files/migration/reports/GEM-India-FFvsRES-February-2025_11.pdf.
Wikipedia
{{cite report |author=Global Energy Monitor |title=Despite a record year, India needs to double renewables deployment by 2030 to meet energy targets |date=February 2025 |url=https://globalenergymonitor.org/sites/default/files/migration/reports/GEM-India-FFvsRES-February-2025_11.pdf |access-date=17 August 2026 |via=Climate Insights Directory}}
BibTeX
@techreport{globalenergymonitor2025despite, author = {{Global Energy Monitor}}, title = {{Despite a record year, India needs to double renewables deployment by 2030 to meet energy targets}}, institution = {Global Energy Monitor}, year = {2025}, month = feb, url = {https://globalenergymonitor.org/sites/default/files/migration/reports/GEM-India-FFvsRES-February-2025_11.pdf}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }

Full text

Collected · Record updated