قائمة المبادئ العامة وال رشاد ية للتكاليف المستوفاة الشروط المغطاة بموجب رسوم الصندوق األخضر للمناخ GCF وتكاليف إدارة المشاريع

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The document outlines the financial and operational rules for GCF fees and project management costs. It specifies payment schedules, eligibility criteria for activities, and documentation requirements for budgets exceeding certain thresholds. It distinguishes between the roles of accredited entities and implementing partners and provides indicative lists of eligible costs for project supervision, completion, and management.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • GCF fees are disbursed in two main stages: 90% of the total agreed fees are paid either proportionally to project fund disbursement or according to a proposed schedule (with an initial payment capped at 50%), while the remaining 10% is paid upon submission of a project completion report.
  • Project management costs funded by the GCF must not exceed the percentage of the total project funded by the GCF and must be presented as a separate budget component with a detailed breakdown.
  • Specific documentation and justification requirements apply to project management costs based on the funding amount: detailed documentation is required if costs exceed 5% for funding proposals over $3 million, or if costs exceed 7.5% for funding and readiness proposals (including National Adaptation Plans) and project preparation facilities for projects up to $3 million.
  • Eligible activities covered by GCF fees include project implementation and supervision (such as financial management monitoring and mid-term reviews), project completion and evaluation (including financial closure), and reporting requirements.
  • Eligible project management costs include salaries for project managers, assistants, and procurement/financial staff, as well as direct costs like office equipment, travel, and IT systems; however, costs for seconded staff from implementing entities or accredited entity consultants are generally excluded unless pre-approved by the GCF.

Cite the original document

APA
Green Climate Fund (n.d.). قائمة المبادئ العامة وال رشاد ية للتكاليف المستوفاة الشروط المغطاة بموجب رسوم الصندوق األخضر للمناخ GCF وتكاليف إدارة المشاريع. https://www.greenclimate.fund/sites/default/files/document/ar-principles-list-costs-pm_0.pdf
Chicago
Green Climate Fund. قائمة المبادئ العامة وال رشاد ية للتكاليف المستوفاة الشروط المغطاة بموجب رسوم الصندوق األخضر للمناخ GCF وتكاليف إدارة المشاريع. n.d. https://www.greenclimate.fund/sites/default/files/document/ar-principles-list-costs-pm_0.pdf.
Wikipedia
{{cite report |author=Green Climate Fund |title=قائمة المبادئ العامة وال رشاد ية للتكاليف المستوفاة الشروط المغطاة بموجب رسوم الصندوق األخضر للمناخ GCF وتكاليف إدارة المشاريع |url=https://www.greenclimate.fund/sites/default/files/document/ar-principles-list-costs-pm_0.pdf |access-date=23 October 2026 |via=Climate Insights Directory}}
BibTeX
@techreport{greenclimatefundndgcf, author = {{Green Climate Fund}}, title = {{قائمة المبادئ العامة وال رشاد ية للتكاليف المستوفاة الشروط المغطاة بموجب رسوم الصندوق األخضر للمناخ GCF وتكاليف إدارة المشاريع}}, institution = {Green Climate Fund}, url = {https://www.greenclimate.fund/sites/default/files/document/ar-principles-list-costs-pm_0.pdf}, urldate = {2026-10-23}, note = {Indexed by Climate Insights Directory} }

Full text

Collected · Record updated