THE SMOKEY MOUNTAIN WASTE-TO-ENERGY PROJECT: ARRESTED DEVELOPMENT AND ENVIRONMENTAL JUSTICE IN URBAN MANILA

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The report finds that the P26 billion Smokey Mountain waste-to-energy project threatens the livelihoods of thousands of waste pickers and ignores the rights of urban poor residents through forced demolitions and a lack of meaningful public consultation.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The proposed waste-to-energy (WtE) facility in Smokey Mountain is a P26 billion, 5.8-hectare project designed to produce 100MW of power by burning 3,000 tonnes of residual waste per day, with operations planned by the end of November 2027.
  • The project is located in an environmentally sensitive area; a November 2023 feasibility study gave the site the lowest possible score of "0" for distance from sensitive land use and distance from surface water, noting it is only 0.12 kilometers from the Navotas River.
  • The project threatens the informal waste economy of Smokey Mountain, where approximately 35% of residents depend on waste picking, which functions as a decentralized Materials Recovery Facility (MRF) diverting waste from landfills.
  • R-II Builders, the project proponent, has been accused of corporate land grabs and illegal demolitions, using armed security to intimidate residents into accepting financial assistance between P10,000 and P150,000 for self-demolition.
  • The project is criticized for lacking transparency and due diligence, as R-II Builders has not yet obtained an Environmental Impact Assessment (EIA) or an Environmental Compliance Certificate (ECC), and has not disclosed a detailed ash management plan.
  • International Financial Institutions (IFIs), including the World Bank, ADB, and AIIB, are accused of undermining national incineration bans through technical assistance and loans, such as a USD 500-million loan for a flood mitigation project that included a WtE component.
  • The project's feedstock requirements may exceed Manila's waste generation capacity; the plant requires 3,000 metric tons per day, while the City of Manila generates only 1,100–1,800 metric tons of solid waste per day.
  • The project proponent, R-II Builders, and its affiliates PhilEco and MIEC, have a history of environmental violations, including the dumping of solid waste and leachate into Manila Bay and a 2026 fire at the Navotas Sanitary Landfill.

Cite the original document

APA
Arevalo, B., & Azurin, M. (2026). THE SMOKEY MOUNTAIN WASTE-TO-ENERGY PROJECT: ARRESTED DEVELOPMENT AND ENVIRONMENTAL JUSTICE IN URBAN MANILA. Global Alliance for Incinerator Alternatives. https://www.no-burn.org/wp-content/uploads/2026/10/The-Smokey-Mountain-Waste-to-Energy-WtE-Project.pdf
Chicago
Arevalo, Brex, and Mayang Azurin. THE SMOKEY MOUNTAIN WASTE-TO-ENERGY PROJECT: ARRESTED DEVELOPMENT AND ENVIRONMENTAL JUSTICE IN URBAN MANILA. Global Alliance for Incinerator Alternatives, 2026. https://www.no-burn.org/wp-content/uploads/2026/10/The-Smokey-Mountain-Waste-to-Energy-WtE-Project.pdf.
Wikipedia
{{cite report |last1=Arevalo |first1=Brex |last2=Azurin |first2=Mayang |title=THE SMOKEY MOUNTAIN WASTE-TO-ENERGY PROJECT: ARRESTED DEVELOPMENT AND ENVIRONMENTAL JUSTICE IN URBAN MANILA |publisher=Global Alliance for Incinerator Alternatives |date=June 2026 |url=https://www.no-burn.org/wp-content/uploads/2026/10/The-Smokey-Mountain-Waste-to-Energy-WtE-Project.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document gaia-000670)}}
BibTeX
@techreport{arevalo2026smokey, author = {Arevalo, Brex and Azurin, Mayang}, title = {{THE SMOKEY MOUNTAIN WASTE-TO-ENERGY PROJECT: ARRESTED DEVELOPMENT AND ENVIRONMENTAL JUSTICE IN URBAN MANILA}}, institution = {Global Alliance for Incinerator Alternatives}, year = {2026}, month = jun, url = {https://www.no-burn.org/wp-content/uploads/2026/10/The-Smokey-Mountain-Waste-to-Energy-WtE-Project.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document gaia-000670} }

Full text

Collected · Record updated