REPPIE WASTE INCINERATOR: A CASE STUDY EXAMINING SOCIAL AND ENVIRONMENTAL IMPLICATIONS

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The Reppie Waste-to-Energy facility in Addis Ababa, Ethiopia, has failed to meet its operational and financial targets, processing significantly less waste and generating less electricity than promised. While framed as a 'silver bullet' for waste management, the project has led to a 50% income decline for informal waste pickers and raised community concerns regarding respiratory illnesses and the disposal of 85 tons of toxic ash produced daily. The study argues that the facility is economically unsustainable compared to renewable energy sources and recommends a shift toward zero waste strategies, such as decentralized composting and recycling, to better suit the city's high proportion of biodegradable waste.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The Reppie WtE facility operates significantly below its designed capacity. While it was intended to process 1,400 tonnes of waste daily to produce 50 MW of electricity, actual throughput is reported as low as 396 tons per day by some sources and 650 tons per day by others.
  • The project has failed to reduce the burden on the Koshe landfill, which continues to expand and receive approximately 3,000 tons of waste daily, maintaining hazards such as water contamination and health risks for nearby residents.
  • Informal waste pickers have experienced severe economic displacement, reporting an average 50% decrease in earnings due to restricted access to recyclables that are now incinerated or controlled.
  • There are significant public health concerns and a lack of transparency regarding emissions. Residents report respiratory illnesses and skin irritation, contradicting official Environmental Impact Assessments (EIAs).
  • The facility produces 85 tons of toxic ash daily, with the report noting that these residues often contain hazardous compounds exceeding safety limits and are frequently dumped or buried openly.
  • The project is economically unsustainable and requires government subsidies. Its annual energy output of approximately 92.8 GWh is far below the projected 185.6 GWh, and it incurs annual operating costs of about 800 million birr ($6.09 million).
  • The study concludes that incineration is ill-suited for the African context because a vast majority of Addis Ababa's household waste (74.29%) is biodegradable, making it more appropriate for composting or anaerobic digestion than burning.
  • Global climate finance for the waste sector is heavily imbalanced, with 94% of methane abatement funding going to incinerators and only 1% to organic waste management.

Cite the original document

APA
Awgichew, E., Okotie, W., & Marnce, C. (2025). REPPIE WASTE INCINERATOR: A CASE STUDY EXAMINING SOCIAL AND ENVIRONMENTAL IMPLICATIONS. Global Alliance for Incinerator Alternatives. https://www.no-burn.org/wp-content/uploads/2025/11/REPPIE_WASTE_INCINERATOR.pdf
Chicago
Awgichew, Eskedar, Weyinmi Okotie, and Carissa Marnce. REPPIE WASTE INCINERATOR: A CASE STUDY EXAMINING SOCIAL AND ENVIRONMENTAL IMPLICATIONS. Global Alliance for Incinerator Alternatives, 2025. https://www.no-burn.org/wp-content/uploads/2025/11/REPPIE_WASTE_INCINERATOR.pdf.
Wikipedia
{{cite report |last1=Awgichew |first1=Eskedar |last2=Okotie |first2=Weyinmi |last3=Marnce |first3=Carissa |title=REPPIE WASTE INCINERATOR: A CASE STUDY EXAMINING SOCIAL AND ENVIRONMENTAL IMPLICATIONS |publisher=Global Alliance for Incinerator Alternatives |date=2025 |url=https://www.no-burn.org/wp-content/uploads/2025/11/REPPIE_WASTE_INCINERATOR.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document gaia-000608)}}
BibTeX
@techreport{awgichew2025reppie, author = {Awgichew, Eskedar and Okotie, Weyinmi and Marnce, Carissa}, title = {{REPPIE WASTE INCINERATOR: A CASE STUDY EXAMINING SOCIAL AND ENVIRONMENTAL IMPLICATIONS}}, institution = {Global Alliance for Incinerator Alternatives}, year = {2025}, url = {https://www.no-burn.org/wp-content/uploads/2025/11/REPPIE_WASTE_INCINERATOR.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document gaia-000608} }

Full text

Collected · Record updated