Incinerador Municipal Drakenstein Estudo de caso da resistência do

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The document details the attempt by the Drakenstein municipality to implement a Waste-to-Energy (WTE) incinerator project in 2012, funded by the US Trade and Development Agency (USTDA) and partnered with Interwaste. It describes how a coalition of community members, environmental groups, and legal experts organized a resistance campaign based on health, environmental, and legal concerns, ultimately leading to the project's termination.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • In 2012, the Drakenstein municipality entered a Memorandum of Understanding (MOU) with Interwaste to build a municipal waste incinerator with an estimated project cost of R$433 million ($25,094,463.56 USD), primarily funded by the United States Trade and Development Agency (USTDA).
  • The document argues that Waste-to-Energy (WTE) incineration is a 'end-of-pipe' solution that fails to address waste at the source, contributes to climate change, and produces toxic ash, flue gases, and air pollutants.
  • A broad coalition of actors resisted the project, including the Drakenstein Environmental Watch (DEW), Wellington Association Against the Incinerator (WAAI), groundWork (gW), South African Waste Pickers Association (SAWPA), GAIA, and various legal clinics and experts.
  • The resistance campaign successfully terminated the project by employing a variety of tactics, including social media, petitions, organized protests, and legal actions focused on legislative violations and the SA Bill of Rights.

Cite the original document

APA
Global Alliance for Incinerator Alternatives (2022). Incinerador Municipal Drakenstein Estudo de caso da resistência do. https://www.no-burn.org/wp-content/uploads/2023/04/PO-sudafrica.pdf
Chicago
Global Alliance for Incinerator Alternatives. Incinerador Municipal Drakenstein Estudo de caso da resistência do. 2022. https://www.no-burn.org/wp-content/uploads/2023/04/PO-sudafrica.pdf.
Wikipedia
{{cite report |author=Global Alliance for Incinerator Alternatives |title=Incinerador Municipal Drakenstein Estudo de caso da resistência do |date=September 2022 |url=https://www.no-burn.org/wp-content/uploads/2023/04/PO-sudafrica.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document gaia-000579)}}
BibTeX
@techreport{globalallianceforincineratoralternatives2022incinerador, author = {{Global Alliance for Incinerator Alternatives}}, title = {{Incinerador Municipal Drakenstein Estudo de caso da resistência do}}, institution = {Global Alliance for Incinerator Alternatives}, year = {2022}, month = sep, url = {https://www.no-burn.org/wp-content/uploads/2023/04/PO-sudafrica.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document gaia-000579} }

Full text

Collected · Record updated