The report examines the Recuperadores Urbanos del Oeste (RUO) cooperative's composting and eco-park project in Buenos Aires, highlighting its role in creating green jobs for waste pickers and reducing methane emissions. It provides an economic analysis showing that while the project relies heavily on public funding and a single commercial client, it generates significant public value through landfill diversion. The document argues that scaling such waste picker-led models is essential for Buenos Aires to meet its zero waste and climate targets, estimating that a city-wide zero waste scenario could reduce GHG emissions by 114 percent by 2050 compared to business-as-usual.
Key insights
- The Recuperadores Urbanos del Oeste (RUO) cooperative operates a composting facility and eco-park in the Caballito neighborhood of Buenos Aires, treating approximately 12.8 tonnes of organic waste per month from sources including schools, hospitals, and over 20 fast food restaurants.
- The RUO initiative employs 12 workers, including eight formalized waste pickers, and produces about four tonnes of compost monthly, which is primarily used within the eco-park or distributed to local institutions.
- Economic analysis reveals that 95 percent of the project's income, approximately US$1,260 per month, comes from food waste collection services for a single fast food chain, with compost sales being negligible due to a lack of certification.
- The project's capital costs are dominated by land and buildings, estimated at US$ 450,000, while operational costs consist primarily of salaries, a pattern consistent with other community-based zero waste models in the global south.
- RUO currently diverts 156 tonnes of organics annually, preventing 7.49 tonnes of methane emissions, which is equivalent to 202.23 tonnes of CO2 equivalents.
- A greenhouse gas analysis indicates that Buenos Aires could reduce annual GHG emissions by 114 percent by 2050 under a Zero Waste Scenario compared to a Business-as-Usual scenario.
- Scaling the RUO project to 100 percent capacity would require an additional US$30,000 for infrastructure and equipment, specifically for a trommel screen and finishing the floor.
Cite the original document
- APA
- Global Alliance for Incinerator Alternatives (2025). Building Community Resilience and Green Jobs through Organic Waste. https://www.no-burn.org/wp-content/uploads/2025/11/Building-Community-Resilience-and-Green-Jobs-through-Organic-Waste_Buenos-Aires.pdf
- Chicago
- Global Alliance for Incinerator Alternatives. Building Community Resilience and Green Jobs through Organic Waste. 2025. https://www.no-burn.org/wp-content/uploads/2025/11/Building-Community-Resilience-and-Green-Jobs-through-Organic-Waste_Buenos-Aires.pdf.
- Wikipedia
- {{cite report |author=Global Alliance for Incinerator Alternatives |title=Building Community Resilience and Green Jobs through Organic Waste |date=November 2025 |url=https://www.no-burn.org/wp-content/uploads/2025/11/Building-Community-Resilience-and-Green-Jobs-through-Organic-Waste_Buenos-Aires.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document gaia-000263)}}
- BibTeX
- @techreport{globalallianceforincineratoralternatives2025building, author = {{Global Alliance for Incinerator Alternatives}}, title = {{Building Community Resilience and Green Jobs through Organic Waste}}, institution = {Global Alliance for Incinerator Alternatives}, year = {2025}, month = nov, url = {https://www.no-burn.org/wp-content/uploads/2025/11/Building-Community-Resilience-and-Green-Jobs-through-Organic-Waste_Buenos-Aires.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document gaia-000263} }
Full text
Collected · Record updated