La RADA celebra término de contrato de la Municipalidad de Temuco con Waste to Energy Araucanía
Summary
The Red de Acción por los Derechos Ambientales (RADA) celebrates the Municipality of Temuco's decision to end its contract with WTE Araucanía, a company that planned to build a waste incinerator in Lautaro. RADA argues that both the original 2017 proposal and the 2019 modified version were technically flawed, lacked transparency regarding toxic ash disposal, and provided insufficient monitoring of carcinogenic emissions like dioxins and furans. The organization highlights that the project would have incinerated materials that are 80% recyclable or compostable, including PET plastics. RADA calls for the adoption of a 'Zero Waste' (Basura Cero) strategy, noting that over 1,200 people have signed a petition requesting this shift in waste management policy.
Key insights
- RADA identifies significant technical flaws and contradictions in both the 2017 and 2019 versions of the WTE Araucanía project, including an energy-inefficient sterilization system and a lack of information regarding the disposal of toxic ashes and separated metals and glass.
- The proposed incinerator lacked adequate environmental safeguards, specifically regarding the monitoring of dangerous substances such as dioxins, furans, and heavy metals, which were only scheduled for annual monitoring.
- The project was criticized for intending to burn materials that are 80% recyclable or compostable, including high-value materials like PET plastic, which are typically collected by waste pickers.
- There was significant public opposition to the project, evidenced by over 3,400 observations submitted in 2017 and more than 13,000 observations submitted in 2019.
- RADA is advocating for the implementation of a 'Zero Waste' (Basura Cero) strategy in Temuco, supported by a petition with over 1,200 signatures, citing successful examples in other cities and the local Campos Deportivos area.
Cite the original document
- APA
- Parra, A., & Larraín, E. P. (2020). La RADA celebra término de contrato de la Municipalidad de Temuco con Waste to Energy Araucanía. Global Alliance for Incinerator Alternatives. https://www.no-burn.org/la-rada-celebra-termino-de-contrato-de-la-municipalidad-de-temuco-con-waste-to-energy-araucania/
- Chicago
- Parra, Alejandra, and Enrique Pizarro Larraín. La RADA celebra término de contrato de la Municipalidad de Temuco con Waste to Energy Araucanía. Global Alliance for Incinerator Alternatives, 2020. https://www.no-burn.org/la-rada-celebra-termino-de-contrato-de-la-municipalidad-de-temuco-con-waste-to-energy-araucania/.
- Wikipedia
- {{cite press release |last1=Parra |first1=Alejandra |last2=Larraín |first2=Enrique Pizarro |title=La RADA celebra término de contrato de la Municipalidad de Temuco con Waste to Energy Araucanía |publisher=Global Alliance for Incinerator Alternatives |date=16 March 2020 |url=https://www.no-burn.org/la-rada-celebra-termino-de-contrato-de-la-municipalidad-de-temuco-con-waste-to-energy-araucania/ |access-date=5 November 2026 |via=Climate Insights Directory (document gaia-000028)}}
- BibTeX
- @misc{parra2020rada, author = {Parra, Alejandra and Larraín, Enrique Pizarro}, title = {{La RADA celebra término de contrato de la Municipalidad de Temuco con Waste to Energy Araucanía}}, publisher = {Global Alliance for Incinerator Alternatives}, year = {2020}, month = mar, url = {https://www.no-burn.org/la-rada-celebra-termino-de-contrato-de-la-municipalidad-de-temuco-con-waste-to-energy-araucania/}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document gaia-000028} }
Full text
Collected · Record updated