Browse all documents

Company profile of Ecoener and Hidralia Energía

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

This research paper provides a company profile and financial overview of the Spanish firms Ecoener and Hidralia Energía, both of which are stakeholders in Hidro Santa Cruz, a company developing a controversial dam in Guatemala.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Ecoener S.L. and Hidralia Energía are the two owners of Hidro Santa Cruz, a company developing a controversial dam in Santa Cruz Barrillas, Huehuetemango. Ecoener holds a majority stake of 85%, while Hidralia Energía owns the remaining 15%.
  • Hidralia Energía is a Spanish-owned engineering firm specializing in hydroelectric projects, often those under 50 MW, as well as civil engineering for dams, roads, and water supply. It maintains a permanent presence in Spain, Ecuador, Costa Rica, and has its main office in Guatemala.
  • Financial data for Ecoener as of December 2012 shows total unconsolidated assets of €37.0 million, with 77.1% financed by group companies and associates. For the year 2012, the company reported a profit after tax of -€678,523.
  • Financial data for Hidralia Energía Ingenieros Consultores as of December 2013 shows total unconsolidated assets of €791,688, with its sole shareholder, Hidraes Ingenieros Consultores SL, financing 24.9%. The company reported a profit after tax of €187,695 for 2013.
  • Hidro Santa Cruz has received financing from Norfund (the state-owned Norwegian Investment Fund for Developing Countries), which provided NOK 32.5 million (€4.16 million) in 2011, and CIFI (Corporación Interamericana para el Financiamiento de Infraestructura). CIFI's 2010 funding plan included a long-term loan of up to US$ 8.2 million and a mezzanine facility of up to US$ 2.5 million.

Cite the original document

APA
van Gelder, J. W., & de Wilde, J. (2015). Company profile of Ecoener and Hidralia Energía. Friends of the Earth International. https://www.foei.org/wp-content/uploads/2020/12/Company-profile-of-Ecoener-and-Hidralia-Energia.pdf
Chicago
van Gelder, Jan Willem, and Joeri de Wilde. Company profile of Ecoener and Hidralia Energía. Friends of the Earth International, 2015. https://www.foei.org/wp-content/uploads/2020/12/Company-profile-of-Ecoener-and-Hidralia-Energia.pdf.
Wikipedia
{{cite report |last1=van Gelder |first1=Jan Willem |last2=de Wilde |first2=Joeri |title=Company profile of Ecoener and Hidralia Energía |publisher=Friends of the Earth International |date=22 January 2015 |url=https://www.foei.org/wp-content/uploads/2020/12/Company-profile-of-Ecoener-and-Hidralia-Energia.pdf |access-date=17 August 2026 |via=Climate Insights Directory}}
BibTeX
@techreport{vangelder2015company, author = {van Gelder, Jan Willem and de Wilde, Joeri}, title = {{Company profile of Ecoener and Hidralia Energía}}, institution = {Friends of the Earth International}, year = {2015}, month = jan, url = {https://www.foei.org/wp-content/uploads/2020/12/Company-profile-of-Ecoener-and-Hidralia-Energia.pdf}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }

Full text

Collected · Record updated