Importing Liquified Natural Gas (LNG)
Summary
The document finds that while 20-50 bcm of additional LNG could be imported into Europe this year using existing infrastructure, global supply constraints and infrastructure limits will likely drive up prices and restrict further growth.
Key insights
- Increasing LNG imports carries risks of methane emissions, as creating and transporting LNG is more methane intensive than piped gas, and may lead to high-carbon infrastructure lock-in due to the 10-20 year long-term contracts required for new supply.
- The timeline for increasing LNG supply varies by infrastructure type: new liquefaction projects typically take 5 years on average to start exports, regasification terminals can be built in 2-3 years with quick decision making, and new floating regasification vessels usually take 5 years to build.
- Global LNG supply is limited, with projected additional supply in 2022 likely to increase global market volumes by only 8% (12 bcm), which may increase international price competition between Asia and Europe.
- Europe's ability to import more LNG is constrained by the almost full utilisation of existing regasification facilities, limiting additional potential to approximately 20 bcm, though estimates suggest 20-50 bcm of additional LNG could be imported this year within existing infrastructure.
Cite the original document
- APA
- Energy Transitions Commission (2022). Importing Liquified Natural Gas (LNG). https://www.energy-transitions.org/wp-content/uploads/2022/05/Importing-Liquified-Natural-Gas-LNG.pdf
- Chicago
- Energy Transitions Commission. Importing Liquified Natural Gas (LNG). 2022. https://www.energy-transitions.org/wp-content/uploads/2022/05/Importing-Liquified-Natural-Gas-LNG.pdf.
- Wikipedia
- {{cite report |author=Energy Transitions Commission |title=Importing Liquified Natural Gas (LNG) |date=May 2022 |url=https://www.energy-transitions.org/wp-content/uploads/2022/05/Importing-Liquified-Natural-Gas-LNG.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document enertran-000120)}}
- BibTeX
- @techreport{energytransitionscommission2022importing, author = {{Energy Transitions Commission}}, title = {{Importing Liquified Natural Gas (LNG)}}, institution = {Energy Transitions Commission}, year = {2022}, month = may, url = {https://www.energy-transitions.org/wp-content/uploads/2022/05/Importing-Liquified-Natural-Gas-LNG.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document enertran-000120} }
Full text
Collected · Record updated