Solution Toolkit: Actions for wind and solar developers
Summary
The document outlines key strategies for wind and solar developers to overcome regulatory, administrative, and societal barriers, emphasizing that comprehensive stakeholder engagement and biodiversity-positive strategies can reduce legal challenges and speed up project deployment.
Key insights
- Effective stakeholder engagement involves mapping relevant stakeholders, starting engagement early, and designing action plans to address issues, which reduces the likelihood and severity of legal challenges.
- Developers should implement biodiversity-conscious siting and construction by using spatial planning, conducting targeted environmental surveys, and monitoring impacts to minimize damage to local ecosystems.
- Leading developers like Ørsted and Iberdrola have set targets to achieve a net-positive biodiversity impact by 2030, which includes restoration projects and protecting existing species.
- Improving the aesthetic design of renewable technology through consultation with local stakeholders and site-specific assessments can improve local acceptance and reduce legal challenges.
- Tangible benefit sharing, such as community ownership, local job creation, and financial contributions, increases local support and can expand the range of available sites for selection.
Cite the original document
- APA
- Energy Transitions Commission (2023). Solution Toolkit: Actions for wind and solar developers. https://www.energy-transitions.org/wp-content/uploads/2023/01/Barriers_PP_DevelopersST_vFinal.pdf
- Chicago
- Energy Transitions Commission. Solution Toolkit: Actions for wind and solar developers. 2023. https://www.energy-transitions.org/wp-content/uploads/2023/01/Barriers_PP_DevelopersST_vFinal.pdf.
- Wikipedia
- {{cite report |author=Energy Transitions Commission |title=Solution Toolkit: Actions for wind and solar developers |date=January 2023 |url=https://www.energy-transitions.org/wp-content/uploads/2023/01/Barriers_PP_DevelopersST_vFinal.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document enertran-000077)}}
- BibTeX
- @techreport{energytransitionscommission2023solution, author = {{Energy Transitions Commission}}, title = {{Solution Toolkit: Actions for wind and solar developers}}, institution = {Energy Transitions Commission}, year = {2023}, month = jan, url = {https://www.energy-transitions.org/wp-content/uploads/2023/01/Barriers_PP_DevelopersST_vFinal.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document enertran-000077} }
Full text
Collected · Record updated