Browse all documents

Hibrit santraller ile güneş kapasitesi rüzgarı geride bıraktı

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

This analysis by Ember examines the status of hybrid solar power plants in Turkey as of the end of 2023, focusing on installed capacity, project pipelines, and the potential for floating solar installations to support national energy goals.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • When including hybrid plants, Turkey's total solar capacity reached 12.2 GW by the end of 2023, surpassing wind capacity. Official statistics previously listed solar at 11.7 GW and wind at 11.8 GW because they excluded the 510 MW of solar capacity installed as auxiliary sources in hybrid plants.
  • Hybrid solar capacity is primarily concentrated in wind power plants, with 63% of the auxiliary solar capacity installed across 14 plants where wind is the primary source. This combination provides a more stable production profile due to the inverse correlation between hourly wind and solar production, which ranged between -0.08 and -0.14 from 2021 to 2023.
  • There is a significant project pipeline for hybrid solar in Turkey, with 1.9 GW of capacity having completed permit processes but not yet installed as of the end of 2023. This pipeline represents 16% of the total solar installed capacity, with 62% allocated to wind plants and 13% to hydroelectric plants.
  • Floating solar (FPV) presents a major growth opportunity for hybrid capacity. If 10% of the water surface of Turkey's ten largest hydroelectric plants—specifically Atatürk, Karakaya, Keban, Ilısu, and Birecik—were used for panels, it would create 17 GW of floating solar potential, with 7.7 GW coming from the Atatürk Dam alone.
  • The distribution of hybrid solar capacity is concentrated in specific provinces. Uşak (82 MW), Bingöl (80 MW), and Sivas (50 MW) together hold 42% of the total hybrid solar installed power. Additionally, Konya (36 MW) and Karaman (40 MW) account for 15% of the capacity.

Cite the original document

APA
Yıldırım, A. (2024). Hibrit santraller ile güneş kapasitesi rüzgarı geride bıraktı. Ember. https://ember-energy.org/app/uploads/2024/02/Hibrit-santraller-ile-gunes-kapasitesi-ruzgari-geride-birakti.pdf
Chicago
Yıldırım, Azem. Hibrit santraller ile güneş kapasitesi rüzgarı geride bıraktı. Ember, 2024. https://ember-energy.org/app/uploads/2024/02/Hibrit-santraller-ile-gunes-kapasitesi-ruzgari-geride-birakti.pdf.
Wikipedia
{{cite report |last1=Yıldırım |first1=Azem |title=Hibrit santraller ile güneş kapasitesi rüzgarı geride bıraktı |publisher=Ember |date=22 February 2024 |url=https://ember-energy.org/app/uploads/2024/02/Hibrit-santraller-ile-gunes-kapasitesi-ruzgari-geride-birakti.pdf |access-date=17 August 2026 |via=Climate Insights Directory}}
BibTeX
@techreport{yldrm2024hibrit, author = {Yıldırım, Azem}, title = {{Hibrit santraller ile güneş kapasitesi rüzgarı geride bıraktı}}, institution = {Ember}, year = {2024}, month = feb, url = {https://ember-energy.org/app/uploads/2024/02/Hibrit-santraller-ile-gunes-kapasitesi-ruzgari-geride-birakti.pdf}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }

Full text

Collected · Record updated