Beyond Tripling: India needs $101bn additional financing for the net-zero pathway

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

This report by Ember analyzes the investment and capacity requirements for India to align its renewable energy targets with the International Energy Agency's (IEA) Net-Zero Emissions (NZE) pathway by 2030, comparing these needs against the targets set in India's 14th National Electricity Plan (NEP14).

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • To align with the IEA NZE pathway, India would need an additional $101 billion in financing beyond what is required for the NEP14 targets. This additional funding is broken down into $68 billion for solar, $8 billion for wind, $14 billion for storage, and $11 billion for transmission capacity.
  • The total investment required for India to meet the NEP14 solar and wind capacity targets, including storage and transmission, is estimated at $293 billion between 2023 and 2030. Moving to the IEA NZE pathway would increase the total investment requirement to approximately $394 billion.
  • To meet the IEA NZE pathway, India's electricity generation would need to be 32% from solar and 10% from wind by 2030. This represents a 35% increase in solar generation and an 8% increase in wind generation compared to the NEP14 projections for FY 2030-31.
  • Achieving the IEA NZE targets would require India to reach a combined solar and wind capacity of 571 GW by 2030. This necessitates adding 115 GW of solar and 9 GW of wind capacity beyond the NEP14 targets of 332 GW (solar) and 113 GW (wind).
  • To align with the IEA NZE pathway, India's annual capacity additions must increase significantly by 2027, reaching 64 GW for solar and 13.6 GW for wind. This represents nearly a five-fold increase compared to the 12.8 GW of solar and 2.28 GW of wind added in 2022.
  • Meeting the IEA NZE pathway requires additional infrastructure beyond the NEP14 plans, specifically an additional 48 GW of Interstate Transmission System (ISTS) and at least 14 GW (6-hour) of battery storage.
  • Renewable energy investments in India are hindered by regulatory, project, and financing risks, including payment delays, land acquisition complexities, and the renegotiation of Power Purchase Agreements (PPAs).

Cite the original document

APA
Rodrigues, N., & Lolla, A. (2023). Beyond Tripling: India needs $101bn additional financing for the net-zero pathway. Ember. https://ember-energy.org/app/uploads/2024/10/Beyond-Tripling_India-needs-financing-to-reach-net-zero-2-1.pdf
Chicago
Rodrigues, Neshwin, and Aditya Lolla. Beyond Tripling: India needs $101bn additional financing for the net-zero pathway. Ember, 2023. https://ember-energy.org/app/uploads/2024/10/Beyond-Tripling_India-needs-financing-to-reach-net-zero-2-1.pdf.
Wikipedia
{{cite report |last1=Rodrigues |first1=Neshwin |last2=Lolla |first2=Aditya |title=Beyond Tripling: India needs $101bn additional financing for the net-zero pathway |publisher=Ember |date=29 November 2023 |url=https://ember-energy.org/app/uploads/2024/10/Beyond-Tripling_India-needs-financing-to-reach-net-zero-2-1.pdf |access-date=17 August 2026 |via=Climate Insights Directory}}
BibTeX
@techreport{rodrigues2023beyond, author = {Rodrigues, Neshwin and Lolla, Aditya}, title = {{Beyond Tripling: India needs \$101bn additional financing for the net-zero pathway}}, institution = {Ember}, year = {2023}, month = nov, url = {https://ember-energy.org/app/uploads/2024/10/Beyond-Tripling_India-needs-financing-to-reach-net-zero-2-1.pdf}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }

Full text

Collected · Record updated