The report argues that simple regulatory adjustments could quickly realize at least 8 GW of hybrid power potential in Türkiye. Key recommendations include removing the requirement for hybrid projects to be physically integrated with the primary plant site, eliminating capacity limits on additional power based on primary source size, and treating hybrid plants as a separate process from new connection capacity allocations. Additionally, the document calls for the establishment of clear numerical targets for hybrid plants within the 2053 goals and improved transparency and accessibility of capacity data for these facilities.
Key insights
- Addressing current challenges facing hybrid power plants could quickly unlock a potential of at least 8 GW.
- Hybrid plants should be managed through a separate process and not be subject to waiting for new connection capacity, as they utilize existing transmission lines of their primary sources and do not require additional grid investment.
- The document recommends removing the capacity limit rule—which currently restricts the amount of hybrid power based on the primary source's capacity (with a general 100 MW upper limit, though removed for wind plants in October 2022)—to allow investors to decide the amount of additional capacity.
- The requirement for hybrid projects to be integrated into the primary plant's site is a major obstacle, often leading to conflicts with 'forbidden areas' such as agricultural and forest lands; removing this requirement for projects connected to the same transformer center would accelerate hybridization.
- There is a need for clear numerical targets for hybrid plants within the 2053 goals and for the public availability of historical and current capacity data, which is currently missing from installed power datasets.
Cite the original document
- APA
- Ember (2025). Bölüm 4: Politika Önerileri. https://ember-energy.org/tr/chapter/politika-onerileri/
- Chicago
- Ember. Bölüm 4: Politika Önerileri. 2025. https://ember-energy.org/tr/chapter/politika-onerileri/.
- Wikipedia
- {{cite report |author=Ember |title=Bölüm 4: Politika Önerileri |date=18 June 2025 |url=https://ember-energy.org/tr/chapter/politika-onerileri/ |access-date=17 August 2026 |via=Climate Insights Directory}}
- BibTeX
- @techreport{ember2025blm, author = {{Ember}}, title = {{Bölüm 4: Politika Önerileri}}, institution = {Ember}, year = {2025}, month = jun, url = {https://ember-energy.org/tr/chapter/politika-onerileri/}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }
Full text
Collected · Record updated