Sustainable Energy Briefing 12
Summary
The briefing argues that the public costs of electricity generation in South Africa, particularly from coal, are at least equivalent to the revenue Eskom derives from it, effectively providing a massive public subsidy to energy-intensive industry.
Key insights
- The public cost of electricity generation in South Africa, borne by society, is greater than the private cost incurred by Eskom, even using conservative estimates.
- Industry and business benefit disproportionately from the effective public subsidy of coal-fired electricity, receiving approximately five times the subsidy of all household customers combined.
- South Africa's energy planning has been stalled or suspended, including the second round of Integrated Energy Planning (IEP 2) and a study on externalised costs, with the government prioritizing short-term goals like the 2010 Soccer World Cup over long-term planning.
- Eskom entered a 25-year electricity supply contract with the Canadian corporation Alcan for the Coega Industrial Development Zone, but the pricing terms remain undisclosed to the public and energy planning officials.
- The planned construction of three coal-fired power plants by Eskom would increase national greenhouse gas emissions by approximately 25% and increase coal-fired generation by 40% at less than 40% efficiency.
- Externalised costs of energy supply include air pollution, greenhouse gas emissions, mining deaths, and infrastructure damage, such as 39 pedestrian deaths in Ermelo in 2006 attributed to coal truck traffic.
Cite the original document
- APA
- Earthlife Africa (n.d.). Sustainable Energy Briefing 12. https://earthlife.org.za/wp-content/uploads/2020/06/se-briefing-12.pdf
- Chicago
- Earthlife Africa. Sustainable Energy Briefing 12. n.d. https://earthlife.org.za/wp-content/uploads/2020/06/se-briefing-12.pdf.
- Wikipedia
- {{cite report |author=Earthlife Africa |title=Sustainable Energy Briefing 12 |url=https://earthlife.org.za/wp-content/uploads/2020/06/se-briefing-12.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document earthli-000053)}}
- BibTeX
- @techreport{earthlifeafricandsustainable, author = {{Earthlife Africa}}, title = {{Sustainable Energy Briefing 12}}, institution = {Earthlife Africa}, url = {https://earthlife.org.za/wp-content/uploads/2020/06/se-briefing-12.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document earthli-000053} }
Full text
Collected · Record updated