Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

This briefing paper argues that the Energy Company Obligation (ECO) requires urgent reform, as current installation rates are so low that meeting the UK's 2030 and 2035 home upgrade targets would take 72 and 217 years respectively.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Current ECO4 delivery rates are insufficient to meet national targets; at the 2022/23 rate of approximately 32,000 homes (plus 37,000 from other policies), achieving the 2030 target would take 72 years and the 2035 target would take 217 years.
  • The shift toward 'deep retrofit' in ECO4 has significantly increased the cost per home while reducing the total number of households treated. Average investment per home rose from £3,500 under ECO3 to £26,000 under ECO4, with the most recent quarter averaging £33,000.
  • The Minimum Requirement (MR) in ECO4, which requires an improvement of 2 SAP ratings (e.g., EPC E to C), prevents shallower retrofits that could benefit a larger number of homes, particularly semi-detached EPC D properties.
  • The supplier obligation remains a crucial delivery route due to its nationwide presence and established supply chains, though it lacks the community-level targeting capabilities of local authorities.
  • Current compliance frameworks, specifically PAS 2035:2023 and PAS 2030:2023, add significant costs and time to projects, with some installers reporting compliance costs exceeding £1,000 per project.
  • Customer assurance mechanisms are viewed as insufficient; remuneration for failures often covers only the original cost of works rather than the actual cost of remediation, and claim timelines are excessively tight.
  • ECO4 has shifted focus toward larger, detached, off-gas grid homes, potentially neglecting the high absolute number of fuel-poor households living in converted flats and terraced homes.
  • While the proportion of ECO4 delivery that can be undertaken via local authority partnership increased from 10% to 50%, only 14.5% of measures have actually been delivered through the LA Flex channel.

Cite the original document

APA
DYSON, J. (2024). THE FUTURE OF THE ENERGY COMPANY OBLIGATION. E3G. https://www.e3g.org/wp-content/uploads/The-future-of-ECO.pdf
Chicago
DYSON, JAMES. THE FUTURE OF THE ENERGY COMPANY OBLIGATION. E3G, 2024. https://www.e3g.org/wp-content/uploads/The-future-of-ECO.pdf.
Wikipedia
{{cite report |last1=DYSON |first1=JAMES |title=THE FUTURE OF THE ENERGY COMPANY OBLIGATION |publisher=E3G |date=March 2024 |url=https://www.e3g.org/wp-content/uploads/The-future-of-ECO.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document e3g-001356)}}
BibTeX
@techreport{dyson2024future, author = {DYSON, JAMES}, title = {{THE FUTURE OF THE ENERGY COMPANY OBLIGATION}}, institution = {E3G}, year = {2024}, month = mar, url = {https://www.e3g.org/wp-content/uploads/The-future-of-ECO.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document e3g-001356} }

Full text

Collected · Record updated