Summary
This statement calls on the UK government to adopt a minimum solar deployment target of 40GW by 2030 to support net zero goals and economic recovery.
Key insights
- The UK solar industry endorses a minimum deployment target of 40GW by 2030, while the National Infrastructure Commission suggests roughly 38GW by 2030 and the Committee on Climate Change suggests 54GW by 2035 is necessary for net zero.
- Solar energy in the UK achieved several milestones in 2020, including a peak generation record of 9.68GW in April, meeting over 11% of total electricity demand in May, and installing 545MW of new capacity (a 27% increase from 2019).
- Community energy projects provide 12-13 times the social and community benefit of commercial installations, but the removal of support over the last 5 years has hindered their ability to make business cases.
- The document recommends specific policy reforms, including zero-rating VAT for solar and storage, extending the Green Homes Grant to include these technologies, and setting a 5GW capacity target for solar through annual Contract for Difference (CfD) auctions.
Cite the original document
- APA
- E3G (n.d.). Solar Statement. https://www.e3g.org/wp-content/uploads/Statement-on-solar-priorities-for-UK-government.pdf
- Chicago
- E3G. Solar Statement. n.d. https://www.e3g.org/wp-content/uploads/Statement-on-solar-priorities-for-UK-government.pdf.
- Wikipedia
- {{cite press release |author=E3G |title=Solar Statement |url=https://www.e3g.org/wp-content/uploads/Statement-on-solar-priorities-for-UK-government.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document e3g-001341)}}
- BibTeX
- @misc{e3gndsolar, author = {{E3G}}, title = {{Solar Statement}}, publisher = {E3G}, url = {https://www.e3g.org/wp-content/uploads/Statement-on-solar-priorities-for-UK-government.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document e3g-001341} }
Full text
Collected · Record updated