NO NEW COAL BY 2021: THE COLLAPSE OF THE GLOBAL COAL PIPELINE

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The pre-construction coal pipeline in South Asia has contracted by 87% since 2015, falling from 292GW to 37.4GW. While India maintains the largest regional pipeline at 21GW, it has seen a 92% decrease in planned projects since 2015. Sri Lanka, Pakistan, and Bangladesh are showing leadership through formal commitments or rapid project cancellations, while in India, progress is primarily occurring at the state level due to the increasing cost-competitiveness of renewables and financial distress among power distribution companies.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The pre-construction coal pipeline in South Asia has decreased by 87% since 2015, dropping from 292GW to 37.4GW. This regional pipeline represents 13% of the global pre-construction total, with cancelled capacity exceeding operational capacity by a ratio of 6.6:1.
  • Sri Lanka, Pakistan, and Bangladesh are leading the regional shift away from coal. Sri Lanka's June 2021 updated NDC formally commits the country to no new coal. Pakistan's Prime Minister announced in December 2020 that the government would not pursue more coal-based power. Bangladesh's pipeline collapsed from 21GW in July 2019 to 10GW, with 10 plants scrapped in the first half of 2021 due to fuel costs, overcapacity, land availability, and financing challenges.
  • India possesses the second largest pre-construction coal pipeline globally at 21GW (56% of the South Asian total) and is constructing 34GW of new capacity. However, its pipeline has decreased by 92% since 2015, with over 326GW of projects cancelled.
  • Economic headwinds are driving India's transition away from coal, including falling average plant load factors (from 61% in 2018 to 53% in 2021) and record-low renewable tariffs of Rs. 1.99/kWh (US$ 0.026/kWh) as of December 2020. Additionally, power distribution companies face expected debts of US$ 80 billion in FY22, and 7,410MW of coal units are facing liquidation.
  • While national political debate in India has been hesitant, sub-national progress is evident. Public officials in the states of Gujarat, Chhattisgarh, Maharashtra, and Karnataka have announced intentions to avoid building new coal power plants between 2019 and 2021.

Cite the original document

APA
E3G (n.d.). NO NEW COAL BY 2021: THE COLLAPSE OF THE GLOBAL COAL PIPELINE. https://www.e3g.org/wp-content/uploads/No-New-Coal-by-2021-6.-South-Asia.pdf
Chicago
E3G. NO NEW COAL BY 2021: THE COLLAPSE OF THE GLOBAL COAL PIPELINE. n.d. https://www.e3g.org/wp-content/uploads/No-New-Coal-by-2021-6.-South-Asia.pdf.
Wikipedia
{{cite report |author=E3G |title=NO NEW COAL BY 2021: THE COLLAPSE OF THE GLOBAL COAL PIPELINE |url=https://www.e3g.org/wp-content/uploads/No-New-Coal-by-2021-6.-South-Asia.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document e3g-001293)}}
BibTeX
@techreport{e3gndnew, author = {{E3G}}, title = {{NO NEW COAL BY 2021: THE COLLAPSE OF THE GLOBAL COAL PIPELINE}}, institution = {E3G}, url = {https://www.e3g.org/wp-content/uploads/No-New-Coal-by-2021-6.-South-Asia.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document e3g-001293} }

Full text

Collected · Record updated