New EU Climate Change Package Fails to Tame King Coal

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The E3G briefing contends that the EU's new climate package retreats from its goal of decarbonising the power sector by failing to guarantee funding for 12 CCS demonstration plants and removing mandatory deployment requirements. With approximately 70% of new EU power capacity expected to come from fossil fuels over the next 25 years—including nearly 40GW of new coal planned by 2012—the document warns that without strong CCS regulation and international cooperation with China, India, and the USA, the EU will miss its 2050 emission targets.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The EU's new climate package represents a retreat from previous ambitions to decarbonise the power sector, specifically by failing to provide guaranteed EU funding for 12 large-scale carbon capture and storage (CCS) demonstration plants and treating mandatory CCS deployment only as a last resort.
  • Despite renewable energy targets, fossil fuels are projected to provide around 70% of new power capacity in Europe over the next 25 years. High gas prices and concerns regarding dependence on Russia are driving a shift toward coal, with nearly 40GW of new coal power stations planned by 2012, primarily in Poland, Germany, and Eastern Europe.
  • The document asserts that the EU cannot meet its goal of reducing total greenhouse gas emissions by 60-80% by 2050 unless fossil power plants built after 2010 are made carbon neutral via CCS, as these plants will still be operational in 2050.
  • The briefing identifies five critical areas for improvement in the climate package: implementing 100% auctioning of emission permits for new plants from 2013, providing new EU funding for CCS demo plants, reinstating mandatory CCS deployment, requiring new plants to be 'carbon capture ready' through full technical reviews, and deepening international CCS cooperation with the USA, China, and India.

Cite the original document

APA
E3G (2008). New EU Climate Change Package Fails to Tame King Coal. https://www.e3g.org/wp-content/uploads/Media_Brief_-_New_EU_Climate_Change_Package_Fails_to_Tame_King_Coal.pdf
Chicago
E3G. New EU Climate Change Package Fails to Tame King Coal. 2008. https://www.e3g.org/wp-content/uploads/Media_Brief_-_New_EU_Climate_Change_Package_Fails_to_Tame_King_Coal.pdf.
Wikipedia
{{cite report |author=E3G |title=New EU Climate Change Package Fails to Tame King Coal |date=22 January 2008 |url=https://www.e3g.org/wp-content/uploads/Media_Brief_-_New_EU_Climate_Change_Package_Fails_to_Tame_King_Coal.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document e3g-001267)}}
BibTeX
@techreport{e3g2008new, author = {{E3G}}, title = {{New EU Climate Change Package Fails to Tame King Coal}}, institution = {E3G}, year = {2008}, month = jan, url = {https://www.e3g.org/wp-content/uploads/Media_Brief_-_New_EU_Climate_Change_Package_Fails_to_Tame_King_Coal.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document e3g-001267} }

Full text

Collected · Record updated