The Net Zero Litmus Test
Summary
The Energy Efficiency Infrastructure Group (EEIG) calls for a systemic shift in UK housing policy to meet net zero 2050 targets. The report proposes a Buildings Energy Infrastructure Programme requiring £1 billion in additional annual public capital to 2035 to support low-income households and unlock £3.5 billion in private investment. It highlights that current progress is stalled, with only 14% of the required annual renovation rate being met, risking failure to meet statutory fuel poverty and carbon budget targets.
Key insights
- The UK's residential sector is the only major sector where emissions are projected to rise until 2035, which the report describes as 'untenable' for achieving net zero emissions.
- To meet the 2035 target of EPC Band C for all homes, 1.2 million properties must be renovated annually; however, in 2017/18, only approximately 170,000 homes received significant upgrades, representing just 14% of the required rate.
- The EEIG proposes a total annual investment of £5.2 billion, consisting of £1.7 billion from public budgets and energy bills (including £1 billion in new ring-fenced public capital) and £3.5 billion from private sources.
- Failure to invest in energy efficiency will increase the cost of decarbonising heat, potentially adding £6.2 billion per year to system costs up to 2050.
- Current investment levels are insufficient to meet England's statutory fuel poverty targets by 2030, with an estimated investment shortfall of £15.1 billion.
- The report identifies significant public health costs associated with poor housing, estimating that health conditions exacerbated by cold homes cost the NHS between £1.4 billion and £2.0 billion annually in England.
- The EEIG recommends several regulatory measures: tightening rented sector standards to EPC C by 2030, introducing mandatory minimum EPC ratings for owner-occupied homes at point of sale, and ensuring new homes are net zero carbon by 2030.
- Scotland is cited as a successful model for the UK, having designated energy efficiency as a national infrastructure priority and implementing a coordinated 20-year programme.
Cite the original document
- APA
- E3G (2019). The Net Zero Litmus Test. https://www.e3g.org/wp-content/uploads/docs/EEIG_NET-ZERO_LITMUS_TEST_2019.pdf
- Chicago
- E3G. The Net Zero Litmus Test. 2019. https://www.e3g.org/wp-content/uploads/docs/EEIG_NET-ZERO_LITMUS_TEST_2019.pdf.
- Wikipedia
- {{cite report |author=E3G |title=The Net Zero Litmus Test |date=October 2019 |url=https://www.e3g.org/wp-content/uploads/docs/EEIG_NET-ZERO_LITMUS_TEST_2019.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document e3g-001154)}}
- BibTeX
- @techreport{e3g2019net, author = {{E3G}}, title = {{The Net Zero Litmus Test}}, institution = {E3G}, year = {2019}, month = oct, url = {https://www.e3g.org/wp-content/uploads/docs/EEIG_NET-ZERO_LITMUS_TEST_2019.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document e3g-001154} }
Full text
Collected · Record updated