The document argues that existing EU infrastructure targets, such as the 2002 goal for 10% interconnection capacity, are outdated and insufficient for a power mix with higher proportions of variable renewables. It proposes five target options: ending market isolation (20% interconnection of peak demand), an EU market objective (doubling net transfer capacity), regional market targets, an EU benchmark for TYNDP project delivery (80% by 2025), and a system flexibility standard. The author emphasizes that the choice of metric (capacity, benchmarks, or flexibility) and governance level (EU, regional, or national) will determine the effectiveness of these targets in reducing regulatory risk and avoiding stranded assets.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The existing EU target for electricity interconnections, set in 2002 at 10% of installed production capacity, is considered inadequate for the future market because it was established before the current internal energy market framework and before variable renewables became significant. As of 2013, nine European countries, including five of the seven largest power systems, had failed to meet this objective.
  • The 'Projects of Common Interest' (PCI) system lacks quantified objectives, creating a risk that infrastructure development may not align with decarbonisation or renewables goals, potentially leading to underinvestment or stranded assets. For instance, gas PCI assessments assumed consumption levels 52-60% higher than the European Commission's Roadmap 2050 decarbonisation scenarios.
  • The paper proposes five specific infrastructure target options for 2030: 1. 'Ending market isolation': Member states achieve interconnection capacity of at least 20% of peak demand. 2. 'EU market objective': Doubling the EU's cross-border net transfer capacity. 3. 'Regional markets': Regional Groups setting targets for intra-regional interconnection or trading. 4. 'EU benchmarks': Delivering at least 80% of projects of European significance from the 2014 Ten Year Network Development Plan (TYNDP) by 2025. 5. 'System flexibility': Doubling the capacity of flexibility resources, including storage, demand response, and interconnection.
  • The document identifies three primary metrics for measuring infrastructure targets: capacity-based measures (nominal or net transfer capacity), benchmarks for the delivery of priority projects (such as TYNDP or PCI lists), and system flexibility indicators (incorporating demand response, storage, and flexible generation).
  • The paper outlines three possible governance levels for target implementation: the EU level (best for overall objectives delivered by institutions like the European Commission, ACER, and ENTSO-E), the regional level (using Regional Groups as a stepping stone to a full market), and the national level (providing clear delivery responsibility for member state governments and TSOs).

Cite the original document

APA
E3G (2013). Options for 2030 infrastructure targets. https://www.e3g.org/wp-content/uploads/docs/E3G_Infrastructure_and_the_EU_2030_climate_and_energy_framework.pdf
Chicago
E3G. Options for 2030 infrastructure targets. 2013. https://www.e3g.org/wp-content/uploads/docs/E3G_Infrastructure_and_the_EU_2030_climate_and_energy_framework.pdf.
Wikipedia
{{cite report |author=E3G |title=Options for 2030 infrastructure targets |date=December 2013 |url=https://www.e3g.org/wp-content/uploads/docs/E3G_Infrastructure_and_the_EU_2030_climate_and_energy_framework.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document e3g-001115)}}
BibTeX
@techreport{e3g2013options, author = {{E3G}}, title = {{Options for 2030 infrastructure targets}}, institution = {E3G}, year = {2013}, month = dec, url = {https://www.e3g.org/wp-content/uploads/docs/E3G_Infrastructure_and_the_EU_2030_climate_and_energy_framework.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document e3g-001115} }

Full text

Collected · Record updated