Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

E3G argues that the UK's electricity market must evolve through a phased process of digitalization and regulatory reform to ensure the least-cost use of resources during the transition to net zero. The document advocates for the retention of marginal pricing as a core long-term mechanism for efficient dispatch, while calling for immediate measures to insulate consumers from high gas-driven prices. E3G recommends the establishment of a technically fluent 'market operator' to arbitrate between system users and operators and suggests moving toward more granular, locational pricing to manage a decentralized grid of renewable assets. The response emphasizes that market design must be supported by broader institutional frameworks, including digital grid infrastructure and science-based infrastructure planning, to avoid wasted investment costs.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The Review of Electricity Market Arrangements (REMA) should not attempt to implement a single, enduring solution but should instead establish long-term objectives, a process for evolution, and immediate incremental steps.
  • Marginal pricing is essential for the long-term efficiency of the electricity system because it ensures the cheapest assets are used and prevents consumers from paying more than they are willing to, though consumers currently need insulation from high gas prices.
  • To manage a highly decentralized grid with millions of renewable generators and electrified transport, the UK should move toward more granular, geographically specific pricing to ensure efficient resource use.
  • A dedicated 'market operator' function is required to arbitrate between system users and operators and drive reforms; E3G suggests Ofgem may not be the ideal candidate for this role due to the need for deep fluency in digital system architecture.
  • Market design is secondary to the need for a broader institutional framework, which must prioritize the digitalization of the grid and electrical devices, as well as science-based infrastructure planning to minimize overall system costs.
  • Future market designs should adopt a whole-systems approach, such as prioritizing heat storage in district networks over electricity storage or improving building energy efficiency to permanently reduce consumption.

Cite the original document

APA
E3G (2022). E3G RESPONSE TO REMA CONSULTATION. https://www.e3g.org/wp-content/uploads/E3G-response-to-REMA-consultation.pdf
Chicago
E3G. E3G RESPONSE TO REMA CONSULTATION. 2022. https://www.e3g.org/wp-content/uploads/E3G-response-to-REMA-consultation.pdf.
Wikipedia
{{cite press release |author=E3G |title=E3G RESPONSE TO REMA CONSULTATION |date=October 2022 |url=https://www.e3g.org/wp-content/uploads/E3G-response-to-REMA-consultation.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document e3g-001009)}}
BibTeX
@misc{e3g2022e3g, author = {{E3G}}, title = {{E3G RESPONSE TO REMA CONSULTATION}}, publisher = {E3G}, year = {2022}, month = oct, url = {https://www.e3g.org/wp-content/uploads/E3G-response-to-REMA-consultation.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document e3g-001009} }

Full text

Collected · Record updated