DIGITAL INNOVATION FOR A NET ZERO ELECTRICITY GRID

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The document outlines the necessity of a fundamental step change in digital technology to support the UK's 2035 electricity decarbonisation target. It identifies failures in current 'bottom-up' innovation funding and proposes 13 recommendations to align market design, governance, and regulation with digital needs. Key proposals include establishing a Digital Delivery Body, appointing a Chief Energy Data and Digitisation Officer, and reforming Ofgem's mandate to prioritise net zero outcomes over conservative risk management.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The UK's target to decarbonise the electricity grid by 2035 requires a shift from a system of few large controllable power plants to one with millions of connected devices, which is impossible without significant digital innovation and deployment.
  • Current digital innovation funding in the UK, including Government grants and the Ofgem Network Innovation Fund, relies on bottom-up processes that lack coordination and fail to provide a clear pathway to commercial scalability for small start-ups.
  • There is a strategic risk to the development of a zero-emission grid due to a lack of coordination between digital and energy system market design teams, partly caused by a deficiency of digital expertise within senior management at BEIS and Ofgem.
  • The diversity of legacy IT systems within network companies hinders the ability of third-party innovators to develop scalable solutions, necessitating a transition toward a common core digital architecture.
  • Ofgem's current conservative approach to regulation is driven by the absence of a statutory mandate to decarbonise the energy system, leading it to prioritise direct consumer benefits over the innovation risks required for net zero.
  • Network companies struggle to integrate digital innovation due to procurement processes designed for physical electrical assets, which follow linear phases rather than the iterative development required for software.

Cite the original document

APA
SKILLINGS, S., & CLUTTON-BROCK, P. (2022). DIGITAL INNOVATION FOR A NET ZERO ELECTRICITY GRID. E3G. https://www.e3g.org/wp-content/uploads/Digital-innovation-for-a-net-zero-electricity-grid.pdf
Chicago
SKILLINGS, SIMON, and PETE CLUTTON-BROCK. DIGITAL INNOVATION FOR A NET ZERO ELECTRICITY GRID. E3G, 2022. https://www.e3g.org/wp-content/uploads/Digital-innovation-for-a-net-zero-electricity-grid.pdf.
Wikipedia
{{cite report |last1=SKILLINGS |first1=SIMON |last2=CLUTTON-BROCK |first2=PETE |title=DIGITAL INNOVATION FOR A NET ZERO ELECTRICITY GRID |publisher=E3G |date=May 2022 |url=https://www.e3g.org/wp-content/uploads/Digital-innovation-for-a-net-zero-electricity-grid.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document e3g-000760)}}
BibTeX
@techreport{skillings2022digital, author = {SKILLINGS, SIMON and CLUTTON-BROCK, PETE}, title = {{DIGITAL INNOVATION FOR A NET ZERO ELECTRICITY GRID}}, institution = {E3G}, year = {2022}, month = may, url = {https://www.e3g.org/wp-content/uploads/Digital-innovation-for-a-net-zero-electricity-grid.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document e3g-000760} }

Full text

Collected · Record updated