4 priorities for a future-oriented Connecting Europe Facility

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The document outlines four priorities for the post-2020 Connecting Europe Facility (CEF): aligning funding with the Paris Agreement by phasing out fossil fuel infrastructure, updating infrastructure priorities to move beyond gas corridors, integrating 'energy efficiency first' principles, and establishing a minimum funding floor of 20% for cross-border renewable energy projects.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The current CEF energy portfolio is heavily skewed toward fossil fuels, with €1.33 billion allocated to 53 gas projects, compared to only €0.04 billion for two smart grid projects. The author argues that continuing to fund fossil fuel infrastructure risks creating stranded assets due to the 40-year lifetime of gas infrastructure and conflicts with the goal of a zero-emission society.
  • The Trans-European Networks for Energy (TEN-E) Regulation, which determines eligibility for CEF funds via Project of Common Interest (PCI) lists, is outdated. It does not account for the Clean Energy Package, the Paris Agreement, or the IPCC 1.5°C report, and continues to prioritize gas corridors despite Commission expectations that gas networks will be complete by the early 2020s.
  • The CEF should incorporate the 'Energy efficiency first' principle from the Energy Union Governance into all sectoral legislation. This approach is intended to lower gas demand, reduce energy costs for citizens and industry, and create jobs.
  • While the European Commission proposed a ceiling of 'up to 10%' of CEF funding for cross-border renewable energy projects—such as offshore wind hubs in the North and Baltic seas—the author recommends a floor limit of 'at least 20%' to provide a stronger signal to private investors.

Cite the original document

APA
E3G (2018). 4 priorities for a future-oriented Connecting Europe Facility. https://www.e3g.org/publications/4-priorities-for-a-future-oriented-connecting-europe-facility/
Chicago
E3G. 4 priorities for a future-oriented Connecting Europe Facility. 2018. https://www.e3g.org/publications/4-priorities-for-a-future-oriented-connecting-europe-facility/.
Wikipedia
{{cite press release |author=E3G |title=4 priorities for a future-oriented Connecting Europe Facility |date=5 November 2018 |url=https://www.e3g.org/publications/4-priorities-for-a-future-oriented-connecting-europe-facility/ |access-date=5 November 2026 |via=Climate Insights Directory (document e3g-000584)}}
BibTeX
@misc{e3g2018priorities, author = {{E3G}}, title = {{4 priorities for a future-oriented Connecting Europe Facility}}, publisher = {E3G}, year = {2018}, month = nov, url = {https://www.e3g.org/publications/4-priorities-for-a-future-oriented-connecting-europe-facility/}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document e3g-000584} }

Full text

Collected · Record updated