Summary
This policy brief highlights how grid capacity shortages are delaying industrial projects across the EU, noting that €60bn in investment was unrealised in Spain alone in 2024.
Key insights
- Grid connection bottlenecks are delaying or cancelling thousands of business projects across the EU, resulting in billions of euros in unrealised investment, including €60bn in Spain in 2024 according to Aelec.
- The ability of an industrial installation to use electricity flexibly to reduce network load is a key factor in whether a project can secure grid access.
- Unlocking stalled investment requires member states, network operators, and regulatory authorities to speedily implement the Electricity Market Directive, the Grid Package, and the Guidance on efficient and timely grid connections.
Cite the original document
- APA
- E3G (2026). Industrial electrification in the EU blocked by the grid. https://www.e3g.org/publications/industrial-electrification-in-the-eu-blocked-by-the-grid/
- Chicago
- E3G. Industrial electrification in the EU blocked by the grid. 2026. https://www.e3g.org/publications/industrial-electrification-in-the-eu-blocked-by-the-grid/.
- Wikipedia
- {{cite report |author=E3G |title=Industrial electrification in the EU blocked by the grid |date=12 March 2026 |url=https://www.e3g.org/publications/industrial-electrification-in-the-eu-blocked-by-the-grid/ |access-date=5 November 2026 |via=Climate Insights Directory (document e3g-000015)}}
- BibTeX
- @techreport{e3g2026industrial, author = {{E3G}}, title = {{Industrial electrification in the EU blocked by the grid}}, institution = {E3G}, year = {2026}, month = mar, url = {https://www.e3g.org/publications/industrial-electrification-in-the-eu-blocked-by-the-grid/}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document e3g-000015} }
Full text
Collected · Record updated