Social housing decarbonisation case studies: Summary report

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The report finds that air source heat pumps are the most common decarbonisation choice for Scottish social landlords, leading to improved EPC ratings (mostly B or C) across all projects.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Air source heat pumps were the most frequently selected zero direct emissions heating (ZDEH) system across the case studies, primarily because they are more affordable and energy efficient than electric storage heaters and have lower capital costs than ground source heat pumps or heat networks.
  • All projects that provided data showed improvements in Energy Performance Certificate (EPC) ratings, with the majority of properties achieving a rating of B or C post-installation.
  • Project planning often overlooked critical costs and requirements, leading to delays and unforeseen expenses, specifically regarding gas meter removals, electricity grid upgrades for solar panels, and planning permission requirements (such as acoustic enclosures for noise).
  • Effective tenant engagement is crucial for project delivery; strategies such as using 'example flats' or demonstrations of the technology in-situ significantly increase tenant confidence and understanding.
  • Post-installation support is necessary because heat pumps require a different operational mindset than gas boilers or storage heaters, and the process of changing electricity meters to a single rate is often slow and difficult for tenants to manage alone.
  • Impact evaluation is inconsistently applied across social landlords, with EPCs being the most common metric, while comprehensive data on energy consumption, temperature, and humidity is rarely collected or still ongoing.
  • Mixed-tenure projects present a significant challenge, as private owners in social housing blocks are often hesitant to participate in ZDEH installations due to the associated costs.

Cite the original document

APA
ClimateXChange (2024). Social housing decarbonisation case studies: Summary report. https://www.climatexchange.org.uk/publications/social-housing-decarbonisation-case-studies-summary-report/
Chicago
ClimateXChange. Social housing decarbonisation case studies: Summary report. 2024. https://www.climatexchange.org.uk/publications/social-housing-decarbonisation-case-studies-summary-report/.
Wikipedia
{{cite report |author=ClimateXChange |title=Social housing decarbonisation case studies: Summary report |date=13 August 2024 |url=https://www.climatexchange.org.uk/publications/social-housing-decarbonisation-case-studies-summary-report/ |access-date=5 November 2026 |via=Climate Insights Directory (document climex-000051)}}
BibTeX
@techreport{climatexchange2024social, author = {{ClimateXChange}}, title = {{Social housing decarbonisation case studies: Summary report}}, institution = {ClimateXChange}, year = {2024}, month = aug, url = {https://www.climatexchange.org.uk/publications/social-housing-decarbonisation-case-studies-summary-report/}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document climex-000051} }

Full text

Collected · Record updated