Reforming Decision-Making in Trans-European Networks for Energy

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The document critiques the European Commission's December 2020 proposal for a revised TEN-E Regulation, highlighting risks of conflict of interest due to the influence of Transmission System Operators (TSOs) and a lack of transparency in selecting Projects of Common Interest (PCIs). It proposes integrating the European Scientific Advisory Board on Climate Change (ESABCC) into the decision-making process for PCI lists and Ten-Year Network Development Plans (TYNDPs) to provide independent, science-based oversight. Key recommendations include adopting PCI lists via separate delegated acts per infrastructure category, mandating public consultations on regional lists, and establishing a common assessment method across regional Groups to prevent bias.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The current TEN-E Proposal is criticized for a deficient governance system characterized by the significant influence of the European Networks of Transmission System Operators for Electricity and Gas (ENTSO-E and ENTSOG) and a lack of transparency, which may lead to conflicts of interest since project promoters are often members of these networks.
  • To mitigate bias and ensure alignment with climate targets, the document recommends involving the European Scientific Advisory Board on Climate Change (ESABCC) in TEN-E decision-making, as it is the only entity solely focused on achieving the Union's climate targets.
  • The author proposes that the Union list of Projects of Common Interest (PCIs) be adopted through separate delegated acts for each infrastructure category, rather than a single act, to allow the European Parliament and Council more effective control and the ability to take differentiated positions.
  • Transparency in the PCI selection process is currently deemed insufficient; the document recommends publishing meeting agendas, minutes, and participant lists for regional Groups, and mandating public consultations on draft regional lists.
  • The document suggests establishing a common assessment method for all regional Groups to ensure objectivity and comparability in project rankings, preventing the use of tailor-made methods that favor specific interests.
  • Regarding Union-wide Ten-Year Network Development Plans (TYNDPs), the document argues that the ESABCC should define qualitative scenarios and independently assess joint scenarios, cost-benefit analysis (CBA) methodologies, and infrastructure gaps reports to prevent the overestimation of infrastructure needs by TSOs.

Cite the original document

APA
Ramo, G., & Toporek, M. (2021). Reforming Decision-Making in Trans-European Networks for Energy. ClientEarth. https://www.clientearth.org/media/wfrbeshx/reforming-decision-making-in-ten-e.pdf
Chicago
Ramo, Guillermo, and Marta Toporek. Reforming Decision-Making in Trans-European Networks for Energy. ClientEarth, 2021. https://www.clientearth.org/media/wfrbeshx/reforming-decision-making-in-ten-e.pdf.
Wikipedia
{{cite report |last1=Ramo |first1=Guillermo |last2=Toporek |first2=Marta |title=Reforming Decision-Making in Trans-European Networks for Energy |publisher=ClientEarth |date=June 2021 |url=https://www.clientearth.org/media/wfrbeshx/reforming-decision-making-in-ten-e.pdf |access-date=23 October 2026 |via=Climate Insights Directory}}
BibTeX
@techreport{ramo2021reforming, author = {Ramo, Guillermo and Toporek, Marta}, title = {{Reforming Decision-Making in Trans-European Networks for Energy}}, institution = {ClientEarth}, year = {2021}, month = jun, url = {https://www.clientearth.org/media/wfrbeshx/reforming-decision-making-in-ten-e.pdf}, urldate = {2026-10-23}, note = {Indexed by Climate Insights Directory} }

Full text

Collected · Record updated