Green Bond Fact Sheet
Summary
The Wilkinsburg-Penn Joint Water Authority issued a USD 26.2 million US Municipal green bond on August 20, 2020, to finance upgrades to its water distribution system, including the Nadine Pump Station and Tyler Road water treatment plant.
Key insights
- The Wilkinsburg-Penn Joint Water Authority issued a USD 26.2 million US Municipal green bond on August 20, 2020, with a maturity date of September 15, 2039, and a tenor of 19.1 years.
- Proceeds from the bond are designated for water system upgrades, specifically targeting the Tyler Road water treatment plant and Nadine Pump Station. Planned works include replacing transmission mains, upgrading main pumps, and the revision or replacement of metering.
- The bond has a credit rating of AA from S&P, a coupon of 3%, and a yield of 2.310%. The issuer is a government-backed entity incorporated in 1945.
Cite the original document
- APA
- Climate Bonds Initiative (2020). Green Bond Fact Sheet. https://www.climatebonds.net/files/drupal-files/files/2020-08_US_The_Wilkinsburg-Penn_Joint_Water_Authority.pdf
- Chicago
- Climate Bonds Initiative. Green Bond Fact Sheet. 2020. https://www.climatebonds.net/files/drupal-files/files/2020-08_US_The_Wilkinsburg-Penn_Joint_Water_Authority.pdf.
- Wikipedia
- {{cite report |author=Climate Bonds Initiative |title=Green Bond Fact Sheet |date=28 August 2020 |url=https://www.climatebonds.net/files/drupal-files/files/2020-08_US_The_Wilkinsburg-Penn_Joint_Water_Authority.pdf |access-date=17 August 2026 |via=Climate Insights Directory}}
- BibTeX
- @techreport{climatebondsinitiative2020green, author = {{Climate Bonds Initiative}}, title = {{Green Bond Fact Sheet}}, institution = {Climate Bonds Initiative}, year = {2020}, month = aug, url = {https://www.climatebonds.net/files/drupal-files/files/2020-08_US_The_Wilkinsburg-Penn_Joint_Water_Authority.pdf}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }
Full text
Collected · Record updated