Green Bond Fact Sheet
Summary
The Southern California Public Power Authority issued a USD 55 million US Municipal green bond on May 12, 2020, to refund outstanding bonds for the Linden Wind Energy Project, a 50MW wind farm in Washington state.
Key insights
- On May 12, 2020, the Southern California Public Power Authority, a government-backed public entity, issued a US Municipal green bond totaling USD 55 million with a maturity date of April 1, 2024, and a tenor of 3.9 years. The bond carries a credit rating of AA- from Fitch, a coupon of 5.000%, and a yield of 1.160%.
- The proceeds from the bond issuance are designated for refunding the outstanding Linden Wind Energy Project. This project consists of a 50MW wind farm featuring 25 wind turbines situated near Goldendale in Klickitat County, Washington, and includes facilities, equipment, fixtures, and improvements.
Cite the original document
- APA
- Climate Bonds Initiative (2020). Green Bond Fact Sheet. https://www.climatebonds.net/files/drupal-files/files/2020-05_US_Southern_California_Public_Power_Authority.pdf
- Chicago
- Climate Bonds Initiative. Green Bond Fact Sheet. 2020. https://www.climatebonds.net/files/drupal-files/files/2020-05_US_Southern_California_Public_Power_Authority.pdf.
- Wikipedia
- {{cite report |author=Climate Bonds Initiative |title=Green Bond Fact Sheet |date=21 May 2020 |url=https://www.climatebonds.net/files/drupal-files/files/2020-05_US_Southern_California_Public_Power_Authority.pdf |access-date=17 August 2026 |via=Climate Insights Directory}}
- BibTeX
- @techreport{climatebondsinitiative2020green, author = {{Climate Bonds Initiative}}, title = {{Green Bond Fact Sheet}}, institution = {Climate Bonds Initiative}, year = {2020}, month = may, url = {https://www.climatebonds.net/files/drupal-files/files/2020-05_US_Southern_California_Public_Power_Authority.pdf}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }
Full text
Collected · Record updated