Green Bond Fact Sheet
Summary
This fact sheet details a JPY 10 billion green bond issued by Kajima Corporation on February 28, 2020, to refinance the construction of two specific buildings in Japan.
Key insights
- Kajima Corporation issued a non-financial corporate green bond on February 28, 2020, with a total amount of JPY 10 billion (approximately USD 92 million) and a maturity date of February 21, 2025.
- The proceeds from the bond are designated for refinancing the construction of the KT Building, completed in 2016, and the Yokohama Gate Tower, which is expected to be finished in 2021.
- Kajima Corporation committed to annual allocation and impact reporting on its website, with the impact report specifically including CO2 emissions data for the target projects.
Cite the original document
- APA
- Climate Bonds Initiative (2020). Green Bond Fact Sheet. https://www.climatebonds.net/files/drupal-files/files/2020-02_JP_Kajima_Corporation%281%29.pdf
- Chicago
- Climate Bonds Initiative. Green Bond Fact Sheet. 2020. https://www.climatebonds.net/files/drupal-files/files/2020-02_JP_Kajima_Corporation%281%29.pdf.
- Wikipedia
- {{cite report |author=Climate Bonds Initiative |title=Green Bond Fact Sheet |date=28 February 2020 |url=https://www.climatebonds.net/files/drupal-files/files/2020-02_JP_Kajima_Corporation%281%29.pdf |access-date=17 August 2026 |via=Climate Insights Directory}}
- BibTeX
- @techreport{climatebondsinitiative2020green, author = {{Climate Bonds Initiative}}, title = {{Green Bond Fact Sheet}}, institution = {Climate Bonds Initiative}, year = {2020}, month = feb, url = {https://www.climatebonds.net/files/drupal-files/files/2020-02_JP_Kajima_Corporation%281%29.pdf}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }
Full text
Collected · Record updated