NEMA Section 24G Application to Rectify Unlawful Activities: Expansion of Processing Area and New Process Water Dam at the Tormin Mine, West Coast Environmental Management Programme

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The report outlines mitigation and management measures for the operational and closure phases of two unlawful activities at the Tormin Mine: the expansion of a processing area and the construction of a process water dam. It identifies low to insignificant environmental impacts and provides a detailed framework for monitoring and rehabilitation to comply with the National Environmental Management Act (NEMA).

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Mineral Sands Resources (Pty) Ltd (MSR) undertook two unlawful activities at the Tormin Mine: clearing 3.9 ha of land for stockpiling adjacent to processing facilities and constructing a 2.2 ha process water dam, which involved a total vegetation clearance of 4.1 ha.
  • The environmental impacts of the unlawful activities are generally rated as low or insignificant, with the most notable negative impacts being the loss of vegetation and Species of Conservation Concern, and disturbance to fauna and loss of habitat, both rated as 'Low (-ve)'.
  • Operational mitigation measures include strict 'No Go' areas to prevent further vegetation removal, a 35 km/h vehicle speed limit to protect fauna, and the requirement that hazardous material storage facilities have a bund containment capacity of 110% of the largest container.
  • The closure phase requires the removal of all infrastructure from affected areas, ripping of disturbed footprints, redistribution of topsoil, and the capping and reseeding of the process water dam unless a future use is identified.
  • The process water dam has a storage capacity exceeding 50,000 m³ and a maximum wall height of approximately 7 metres.

Cite the original document

APA
Masson, S. (2018). NEMA Section 24G Application to Rectify Unlawful Activities: Expansion of Processing Area and New Process Water Dam at the Tormin Mine, West Coast Environmental Management Programme. Centre for Environmental Rights. https://cer.org.za/wp-content/uploads/2020/06/SRK-Tormin-s24G-application-July2018.pdf?x21779
Chicago
Masson, Scott. NEMA Section 24G Application to Rectify Unlawful Activities: Expansion of Processing Area and New Process Water Dam at the Tormin Mine, West Coast Environmental Management Programme. Centre for Environmental Rights, 2018. https://cer.org.za/wp-content/uploads/2020/06/SRK-Tormin-s24G-application-July2018.pdf?x21779.
Wikipedia
{{cite report |last1=Masson |first1=Scott |title=NEMA Section 24G Application to Rectify Unlawful Activities: Expansion of Processing Area and New Process Water Dam at the Tormin Mine, West Coast Environmental Management Programme |publisher=Centre for Environmental Rights |date=May 2018 |url=https://cer.org.za/wp-content/uploads/2020/06/SRK-Tormin-s24G-application-July2018.pdf?x21779 |access-date=17 August 2026 |via=Climate Insights Directory}}
BibTeX
@techreport{masson2018nema, author = {Masson, Scott}, title = {{NEMA Section 24G Application to Rectify Unlawful Activities: Expansion of Processing Area and New Process Water Dam at the Tormin Mine, West Coast Environmental Management Programme}}, institution = {Centre for Environmental Rights}, year = {2018}, month = may, url = {https://cer.org.za/wp-content/uploads/2020/06/SRK-Tormin-s24G-application-July2018.pdf?x21779}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }

Full text

Collected · Record updated