Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The document serves as a technical guide for navigating the transition between various iterations of South African environmental legislation, including the Environment Conservation Act (ECA) and the National Environmental Management Act (NEMA). It details how pending applications and unlawfully commenced activities (Section 24G) are treated when the listed activities they pertain to have changed, been repealed, or been re-worded in newer regulations such as GNR 982. The guide includes extensive cross-reference tables mapping old listed activities to their current equivalents in GNR 983, 984, and 985, while noting that some activities are now governed by the National Environmental Management: Waste Act (NEMWA).

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Pending applications for environmental authorisation submitted under previous ECA or NEMA regulations must be processed under those repealed regulations if the activity is still listed; however, they are deemed withdrawn if the activity is no longer listed.
  • For activities unlawfully commenced under ECA regulations, rectification via Section 24G of NEMA is not possible if the activity is no longer listed under NEMA, unless the application was submitted between 7 January 2005 and 06 July 2005.
  • Environmental decisions and authorisations, including those for Section 24G rectification, cannot exceed the scope of current listed activities; if new regulations include different wording or thresholds, only the overlapping portion of the original activity can be authorised.
  • Certain activities previously managed under EIA regulations are now governed by the National Environmental Management: Waste Act, 2008 (NEMWA), and proponents must check section 19 of that Act for applicable waste management activities.
  • The guide maps specific historical activities to current 2014 NEMA listings (GNR 983, 984, 985), such as mapping the construction of facilities for commercial electricity generation to multiple activities in GNR 983 and 984.

Cite the original document

APA
Centre for Environmental Rights (2015). S24G and Similar Listings. https://cer.org.za/wp-content/uploads/2010/03/Similar-Listings-Document-January-2015_3.pdf?x21779
Chicago
Centre for Environmental Rights. S24G and Similar Listings. 2015. https://cer.org.za/wp-content/uploads/2010/03/Similar-Listings-Document-January-2015_3.pdf?x21779.
Wikipedia
{{cite report |author=Centre for Environmental Rights |title=S24G and Similar Listings |date=January 2015 |url=https://cer.org.za/wp-content/uploads/2010/03/Similar-Listings-Document-January-2015_3.pdf?x21779 |access-date=17 August 2026 |via=Climate Insights Directory}}
BibTeX
@techreport{centreforenvironmentalrights2015s24g, author = {{Centre for Environmental Rights}}, title = {{S24G and Similar Listings}}, institution = {Centre for Environmental Rights}, year = {2015}, month = jan, url = {https://cer.org.za/wp-content/uploads/2010/03/Similar-Listings-Document-January-2015_3.pdf?x21779}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }

Full text

Collected · Record updated