majuba-power-station-monitor-availability-calculations-rev-2-31-august-2016-fk-6e025e74cc869a06.pdf

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

A letter from Eskom's Majuba Power Station to the Gert Sibande District Municipality reporting the availability of continuous dust emissions monitors from April 2015 to March 2016. It notes that gaseous emission monitors were only commissioned in April 2016 and explains availability gaps for Unit 5 (overhaul) and Unit 4 (equipment drift).

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Between 1 April 2015 and 31 March 2016, Majuba Power Station reported the availability of continuous dust emissions monitors (PM) across its six units to fulfill reporting requirements under Section 15 of the Minimum Emission Standards.
  • Gaseous emission monitors provided no data for the 2016 financial year because they were not commissioned until April 2016.
  • Specific operational issues affected monitor availability: Unit 5 underwent a general overhaul from April 2015 until January 2016, and the Unit 4 dust monitor recorded negative readings during August and September 2015, resulting in availability of less than 80% for that period.

Cite the original document

APA
Centre for Environmental Rights (n.d.). majuba-power-station-monitor-availability-calculations-rev-2-31-august-2016-fk-6e025e74cc869a06.pdf. https://cer.org.za/wp-content/uploads/2017/07/Majuba-Power-Station-Monitor-Availability-Calculations-Rev-2-31-August-2016-FK.pdf?x21779
Chicago
Centre for Environmental Rights. majuba-power-station-monitor-availability-calculations-rev-2-31-august-2016-fk-6e025e74cc869a06.pdf. n.d. https://cer.org.za/wp-content/uploads/2017/07/Majuba-Power-Station-Monitor-Availability-Calculations-Rev-2-31-August-2016-FK.pdf?x21779.
Wikipedia
{{cite press release |author=Centre for Environmental Rights |title=majuba-power-station-monitor-availability-calculations-rev-2-31-august-2016-fk-6e025e74cc869a06.pdf |url=https://cer.org.za/wp-content/uploads/2017/07/Majuba-Power-Station-Monitor-Availability-Calculations-Rev-2-31-August-2016-FK.pdf?x21779 |access-date=17 August 2026 |via=Climate Insights Directory}}
BibTeX
@misc{centreforenvironmentalrightsndmajubapowerstationmonitoravailabilitycalculationsrev231august2016fk6e025e74cc869a06pdf, author = {{Centre for Environmental Rights}}, title = {{majuba-power-station-monitor-availability-calculations-rev-2-31-august-2016-fk-6e025e74cc869a06.pdf}}, publisher = {Centre for Environmental Rights}, url = {https://cer.org.za/wp-content/uploads/2017/07/Majuba-Power-Station-Monitor-Availability-Calculations-Rev-2-31-August-2016-FK.pdf?x21779}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }

Full text

Collected · Record updated