THE UPDATED INTEGRATED RESOURCE PLAN FOR ELECTRICITY (IRP) AND INTEGRATED ENERGY PLAN (IEP)

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The Life After Coal/Impilo Ngaphandle Kwamalahle Campaign, comprising the Centre for Environmental Rights, groundWork, Earthlife Africa, and Greenpeace Africa, submitted a letter to the Portfolio Committee on Energy on 16 April 2018. The campaign expressed concern that the updated Integrated Resource Plan (IRP) might be published without further public consideration and comment, which they argue would make the plan "vulnerable to legal challenge". They requested that the Committee ask the Department of Energy whether further public consultation will be provided and urged the Department to consider evidence from the Council for Scientific and Industrial Research (CSIR), Meridian Economics, and the Frankfurt Institute, which they state "confirm that new coal-fired electricity is unnecessary and costly".

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The Life After Coal/Impilo Ngaphandle Kwamalahle Campaign argues that publishing the IRP update without further public consideration and comment is "unacceptable" and would leave the document "vulnerable to legal challenge".
  • The campaign demands that the public be given a "sufficient and reasonable opportunity" to review and comment on the draft IRP before it is officially promulgated.
  • The campaign asserts that findings from the Frankfurt Institute, Meridian Economics, and the Council for Scientific and Industrial Research (CSIR) demonstrate that the construction of new coal-fired electricity plants is both expensive and unnecessary.

Cite the original document

APA
Centre for Environmental Rights (2018). THE UPDATED INTEGRATED RESOURCE PLAN FOR ELECTRICITY (IRP) AND INTEGRATED ENERGY PLAN (IEP). https://cer.org.za/wp-content/uploads/2018/04/LAC-and-GP-letter-to-PCEA-16-April-18.pdf?x21779
Chicago
Centre for Environmental Rights. THE UPDATED INTEGRATED RESOURCE PLAN FOR ELECTRICITY (IRP) AND INTEGRATED ENERGY PLAN (IEP). 2018. https://cer.org.za/wp-content/uploads/2018/04/LAC-and-GP-letter-to-PCEA-16-April-18.pdf?x21779.
Wikipedia
{{cite press release |author=Centre for Environmental Rights |title=THE UPDATED INTEGRATED RESOURCE PLAN FOR ELECTRICITY (IRP) AND INTEGRATED ENERGY PLAN (IEP) |date=16 April 2018 |url=https://cer.org.za/wp-content/uploads/2018/04/LAC-and-GP-letter-to-PCEA-16-April-18.pdf?x21779 |access-date=17 August 2026 |via=Climate Insights Directory}}
BibTeX
@misc{centreforenvironmentalrights2018updated, author = {{Centre for Environmental Rights}}, title = {{THE UPDATED INTEGRATED RESOURCE PLAN FOR ELECTRICITY (IRP) AND INTEGRATED ENERGY PLAN (IEP)}}, publisher = {Centre for Environmental Rights}, year = {2018}, month = apr, url = {https://cer.org.za/wp-content/uploads/2018/04/LAC-and-GP-letter-to-PCEA-16-April-18.pdf?x21779}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }

Full text

Collected · Record updated