Browse all documents

THE UPDATED INTEGRATED RESOURCE PLAN FOR ELECTRICITY (IRP) AND INTEGRATED ENERGY PLAN (IEP)

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

A letter from the Life After Coal/Impilo Ngaphandle Kwamalahle Campaign and Greenpeace Africa to the Portfolio Committee on Energy, expressing concerns over the lack of public consultation regarding the updated Integrated Resource Plan (IRP) and Integrated Energy Plan (IEP).

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The Life After Coal/Impilo Ngaphandle Kwamalahle Campaign and Greenpeace Africa argue that the updated Integrated Resource Plan (IRP) is likely to be published without further public consideration or comment, which they claim would make the document "vulnerable to legal challenge".
  • The authors request that the Department of Energy provide a fair and reasonable public consultation process for the IRP Update and IEP, noting that these documents have "far-reaching implications for the health and wellbeing of all South Africans".
  • The campaign urges the Department of Energy to incorporate findings from the Frankfurt Institute, Meridian Economics, and the Council for Scientific and Industrial Research (CSIR), which indicate that "new coal-fired electricity is unnecessary and costly".
  • The letter references statements by Director-General Thabane Zulu indicating that the IRP is a "high priority" and is expected to be published soon, while noting the Department's desire to avoid an IRP that is "vulnerable to legal attack".

Cite the original document

APA
Centre for Environmental Rights (2018). THE UPDATED INTEGRATED RESOURCE PLAN FOR ELECTRICITY (IRP) AND INTEGRATED ENERGY PLAN (IEP). https://cer.org.za/wp-content/uploads/2018/04/LAC-and-GP-letter-to-PCEA-16-April-18.pdf?x21779
Chicago
Centre for Environmental Rights. THE UPDATED INTEGRATED RESOURCE PLAN FOR ELECTRICITY (IRP) AND INTEGRATED ENERGY PLAN (IEP). 2018. https://cer.org.za/wp-content/uploads/2018/04/LAC-and-GP-letter-to-PCEA-16-April-18.pdf?x21779.
Wikipedia
{{cite press release |author=Centre for Environmental Rights |title=THE UPDATED INTEGRATED RESOURCE PLAN FOR ELECTRICITY (IRP) AND INTEGRATED ENERGY PLAN (IEP) |date=16 April 2018 |url=https://cer.org.za/wp-content/uploads/2018/04/LAC-and-GP-letter-to-PCEA-16-April-18.pdf?x21779 |access-date=17 August 2026 |via=Climate Insights Directory}}
BibTeX
@misc{centreforenvironmentalrights2018updated, author = {{Centre for Environmental Rights}}, title = {{THE UPDATED INTEGRATED RESOURCE PLAN FOR ELECTRICITY (IRP) AND INTEGRATED ENERGY PLAN (IEP)}}, publisher = {Centre for Environmental Rights}, year = {2018}, month = apr, url = {https://cer.org.za/wp-content/uploads/2018/04/LAC-and-GP-letter-to-PCEA-16-April-18.pdf?x21779}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }

Full text

Collected · Record updated