Browse all documents

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

A letter from the South African Department of Environmental Affairs to Eskom granting a postponement of compliance time-frames for minimum emission standards at the Kriel Power Station.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The National Air Quality Officer granted a postponement of compliance with minimum emission standards for particulate matter (PM) at Kriel Power Station from 01 April 2015 to 31 March 2020, setting a limit of 125mg/Nm3 for this period based on the finding that the facility operates at this level if proper maintenance is performed.
  • A postponement for NOx emission standards for existing plant was granted from 01 April 2015 to 31 March 2020 with a limit of 1600mg/Nm3. Additionally, a postponement for new plant standards was granted from 1 April 2020 to 31 March 2025 with a limit of 2800mg/Nm3.
  • Kriel Power Station is scheduled for decommissioning between 2030 and 2034, based on a 50 year life span. Eskom is required to provide a definite offset implementation plan to reduce PM pollution in the ambient/receiving environment by 31 March 2016.

Cite the original document

APA
Centre for Environmental Rights (n.d.). KM_C554e-20150213195536. https://cer.org.za/wp-content/uploads/2015/02/Kriel-Letter.pdf?x21779
Chicago
Centre for Environmental Rights. KM_C554e-20150213195536. n.d. https://cer.org.za/wp-content/uploads/2015/02/Kriel-Letter.pdf?x21779.
Wikipedia
{{cite press release |author=Centre for Environmental Rights |title=KM_C554e-20150213195536 |url=https://cer.org.za/wp-content/uploads/2015/02/Kriel-Letter.pdf?x21779 |access-date=17 August 2026 |via=Climate Insights Directory}}
BibTeX
@misc{centreforenvironmentalrightsndkmc554e20150213195536, author = {{Centre for Environmental Rights}}, title = {{KM\_C554e-20150213195536}}, publisher = {Centre for Environmental Rights}, url = {https://cer.org.za/wp-content/uploads/2015/02/Kriel-Letter.pdf?x21779}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }

Full text

Collected · Record updated