eskom-kendal-3aad915c452c4fca.pdf
Summary
The South African Department of Environmental Affairs has paused Eskom's application to postpone compliance with the 2015 Minimum Emission Standards for the Kendal Power Station, citing missing data on emission limits, future compliance plans, air quality trends, and PM25 impacts.
Key insights
- The Department of Environmental Affairs has placed Eskom's postponement application for compliance with the 2015 Minimum Emission Standards for the Kendal Power Station on hold due to insufficient information.
- The Department identified five specific deficiencies in the application: the absence of current stack emission limits, a lack of future compliance plans, the absence of time series plots for ambient air quality monitoring to show trends and exceedances, inaccurate frequency plots that obscure pollutant trends and data gaps, and limited data for assessing PM25 health and environmental impacts.
Cite the original document
- APA
- Centre for Environmental Rights (n.d.). eskom-kendal-3aad915c452c4fca.pdf. https://cer.org.za/wp-content/uploads/2014/07/Eskom-Kendal.pdf?x21779
- Chicago
- Centre for Environmental Rights. eskom-kendal-3aad915c452c4fca.pdf. n.d. https://cer.org.za/wp-content/uploads/2014/07/Eskom-Kendal.pdf?x21779.
- Wikipedia
- {{cite press release |author=Centre for Environmental Rights |title=eskom-kendal-3aad915c452c4fca.pdf |url=https://cer.org.za/wp-content/uploads/2014/07/Eskom-Kendal.pdf?x21779 |access-date=17 August 2026 |via=Climate Insights Directory}}
- BibTeX
- @misc{centreforenvironmentalrightsndeskomkendal3aad915c452c4fcapdf, author = {{Centre for Environmental Rights}}, title = {{eskom-kendal-3aad915c452c4fca.pdf}}, publisher = {Centre for Environmental Rights}, url = {https://cer.org.za/wp-content/uploads/2014/07/Eskom-Kendal.pdf?x21779}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }
Full text
Collected · Record updated