INTEGRATED RESOURCE PLAN 2019 AND THE MINISTERIAL DETERMINATION ON THE PROCUREMENT OF NEW GENERATION CAPACITY FROM RENEWABLES, STORAGE, GAS AND COAL

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The Centre for Environmental Rights, representing groundWork, Vukani Environmental Justice Movement in Action, and the African Climate Alliance, has formally objected to the inclusion of new fossil fuel generation capacity—specifically 1500 MW of new coal—in South Africa's Integrated Resource Plan (IRP) 2019 and a September 2020 ministerial determination. The letter requests that the Minister of Mineral Resources and Energy clarify if the IRP 2019 will be updated by the end of 2021, citing a June 2021 announcement by President Ramaphosa to increase the NERSA generation licence exemption threshold to 100 MW. The authors argue this change could unlock over 5000 MW of embedded generation capacity not currently accounted for in the IRP 2019, necessitating a revision of the proposed energy mix.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The authors contend that the written justifications provided by the Department for the determination and by NERSA for its concurrence are not reasonable, rational, or lawful.
  • A June 10, 2021, announcement by President Ramaphosa regarding the amendment of Schedule 2 of the Electricity Regulation Act, 2006 (ERA) to allow projects up to 100 MW to generate electricity without a NERSA licence may unlock more than 5000 MW of embedded generation capacity not included in the IRP 2019.

Cite the original document

APA
Centre for Environmental Rights (2021). INTEGRATED RESOURCE PLAN 2019 AND THE MINISTERIAL DETERMINATION ON THE PROCUREMENT OF NEW GENERATION CAPACITY FROM RENEWABLES, STORAGE, GAS AND COAL. https://cer.org.za/wp-content/uploads/2021/09/CER-letter-to-Minister-Mantashe-NERSA-9.7.21.docx.pdf?x21779
Chicago
Centre for Environmental Rights. INTEGRATED RESOURCE PLAN 2019 AND THE MINISTERIAL DETERMINATION ON THE PROCUREMENT OF NEW GENERATION CAPACITY FROM RENEWABLES, STORAGE, GAS AND COAL. 2021. https://cer.org.za/wp-content/uploads/2021/09/CER-letter-to-Minister-Mantashe-NERSA-9.7.21.docx.pdf?x21779.
Wikipedia
{{cite press release |author=Centre for Environmental Rights |title=INTEGRATED RESOURCE PLAN 2019 AND THE MINISTERIAL DETERMINATION ON THE PROCUREMENT OF NEW GENERATION CAPACITY FROM RENEWABLES, STORAGE, GAS AND COAL |date=9 July 2021 |url=https://cer.org.za/wp-content/uploads/2021/09/CER-letter-to-Minister-Mantashe-NERSA-9.7.21.docx.pdf?x21779 |access-date=17 August 2026 |via=Climate Insights Directory}}
BibTeX
@misc{centreforenvironmentalrights2021integrated, author = {{Centre for Environmental Rights}}, title = {{INTEGRATED RESOURCE PLAN 2019 AND THE MINISTERIAL DETERMINATION ON THE PROCUREMENT OF NEW GENERATION CAPACITY FROM RENEWABLES, STORAGE, GAS AND COAL}}, publisher = {Centre for Environmental Rights}, year = {2021}, month = jul, url = {https://cer.org.za/wp-content/uploads/2021/09/CER-letter-to-Minister-Mantashe-NERSA-9.7.21.docx.pdf?x21779}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }

Full text

Collected · Record updated